Laserfiche WebLink
item No. 1 <br /> PC: 11-5-92 <br /> SU-91-15 <br /> C. Significant Impact• Cumulative traffic impacts. <br /> ^Project traffic, when added to cumulative Condit rd from i�randt Road would Tuly Road.LOS E/F <br /> operations on State Routes 12!88 through L <br /> Finding: <br /> Specific economic, social, or other considerations make infeasible any mitigation measures or <br /> project alternatives identified in the Final EIR. <br /> Statement of Fact: <br /> Existing, plus project, plus known cumulative projects, do not yield a change in traffic conditions <br /> and do not degrade traffic conditions to unacceptable levels. The State Route is a regional <br /> facility,and the long-term cumulative traffic impacts are regional concerns which will be addressed <br /> on a regional basis. Long-term effects will be studied and resolved in such vehicles as the <br /> General Plan process, engineering studies funded by the sales and gasoline taxes, and resulting <br /> mitigation fees. Additionally,the project is already subject to the payment of the County's Traffic <br /> Impact Mitigation Fees. In an effort to provide mitigation for these cumulative traffic impacts to <br /> the extent that is practicable, the developer will contribute his `fair share" of fees toward future <br /> roadway improvements in the Lockeford area <br /> -36- <br />