My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012821
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
13751
>
2600 - Land Use Program
>
SU-91-15
>
SU0012821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 5:16:09 PM
Creation date
9/4/2019 10:36:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012821
PE
2611
FACILITY_NAME
SU-91-15
STREET_NUMBER
13751
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237-
APN
01906029
ENTERED_DATE
1/9/2020 12:00:00 AM
SITE_LOCATION
13751 E BRANDT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\B\BRANDT\13751\SU-91-15\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Suggested Air Quality Dust Mitigation Measures <br /> (for Construction Sites) <br /> Pre-Construction - Emissions generated during the pre-construction process are of a concern to the <br /> District. The following dust control practices should be implemented: <br /> > All material excavated or graded should be sufficiently watered to prevent excessive amount <br /> of dust. Watering should occur at least twice a day with complete coverage, preferably in the <br /> late morning and after work is done for the day. <br /> All clearing, grading, earth moving, or excavation activities should cease during periods of <br /> high winds greater than 24 mph average over one hour. <br /> All material transported off-site should be either sufficiently watered or securely covered to <br /> prevent excessive amounts of dust. <br /> > The area disturbed by clearing, earth moving, or excavation activities should be minimized at <br /> all times. <br /> > The developer should mow, instead of disking, for weed control, thereby leaving the ground <br /> undisturbed and with a mulch covering. <br /> During Construction - After clearing, grading, earth moving, or excavation operations, during the <br /> construction phase, fugitive dust emissions should be controlled by the following methods: <br /> > All inactive portions of the construction site should be seeded and watered until grass growth <br /> is evident. <br /> > All active portions should be sufficiently watered to prevent excessive amounts of dust. <br /> General Fugitive Dust - At all times, fugitive dust emissions should be controlled using the <br /> following procedures: <br /> > On-site vehicle speed should be limited to 15 mph. <br /> > All areas with vehicle traffic should be watered periodically or have petroleum-based <br /> palliatives' applied for stabilization of dust emissions. <br /> > Streets adjacent to the project site should be swept at least once per day to remove silt which <br /> may have accumulated from, construction activities. <br /> > Build a paved "apron" into project from ajoining paved roadways. <br /> f <br /> Ozone Precursors - At all times, ozone precursor emissions should be controlled by the following <br /> methods: <br /> > All internal combustion engines driven equipment should be properly maintained and well <br /> tuned according to manufacturer's specifications. <br /> > During the smog season (May through October), the construction period should be lengthened <br /> so as to minimize the number of vehicles and equipment operating at the same time. <br /> STVl7APCD 8126192 <br /> ' Use of petroleum-based palliatives shall meet the road oil requirements of the District's Rule <br /> j 409.5 - Cutback Asphalt Paving Materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.