Laserfiche WebLink
i <br /> Sari Joaquin Valley. <br /> ,: Air Pollution Control District <br /> COMPLIANCE ASSISTANCE BULLETIN <br /> October=2004' <br /> FugitivePNew RqurrementsI.. t . i <br /> Regulation Vlll, 'Fugitive PM10 Prohibitionsi of the District's.Rules and Regulations apply to actwities that <br /> generate fugitive. dust. Fugitivedust is emitted into the air by activities that `disturb.the-soil,. such as from <br /> earthmoving activities and vehicular/equipment traffic on unpaved surfaces. Windblown dust is'also of concern <br /> at construction sites. <br /> The District adopted Regulation VIII in.1993'and its.most recent amendments became effective on October 1, <br /> 2004. This is a basic summary of the regulation's requirements as they apply to construction sites. <br /> Visible. Dust Emissions (VDE) may not exceed 20% opacity during periods when soil is being disturbed by <br /> equipment or by wind at any time. Visible Dust Emissions opacity of 20% means dust that would obstruct an <br /> observer's view of an object by 20%. District inspectors are state certified to evaluate visible emissions. Dust <br /> control may be achieved by applying water before/during earthwork and onto unpaved traffic areas, phasing <br /> work to limit dust, and setting up wind fences to limit wind blown dust. <br /> Soil Stabilization is required at regulated construction sites after normal working hours and on weekends and <br /> holidays. This requirement also applies to inactive construction areas such as phased projects where <br /> disturbed land is left unattended. Applying water to form a visible crust on the soil and restricting vehicle <br /> access are often effective for short-term stabilization of disturbed surface areas. Long-term methods including <br /> applying dust suppressants and establishing vegetative cover. <br /> Carryout and Trackout occur when materials from emptied or loaded vehicles falls onto a paved surface or <br /> shoulder of a public road or when materials adhere to vehicle tires and are deposited onto a paved surface or <br /> shoulder of a public road. Should either occur, the material must be cleaned up at least daily, and immediately <br /> if it extends more than 50 feet from the exit point onto a paved road. The appropriate clean-up methods <br /> require the complete removal and cleanup of mud and dirt from the paved surface and shoulder. Using a <br /> blower device or dry sweeping with any mechanical device other than a PM10-efficient street sweeper is a <br /> violation. Larger construction sites must prevent carryout and trackout from occurring by installing gravel pads, <br /> grizzlies, wheel washers, paved interior roads, or a combination thereof at each exit point from the site. <br /> Access and Haul Roads that are unpaved, as well as unpaved vehicle and equipment traffic areas at <br /> construction sites must have dust control. Speed limit signs limiting vehicle speed to 15 mph or less at <br /> construction sites must be posted every 500 feet. <br /> Storage Piles and Bulk Materials have handling, storage, and transportation requirements that include <br /> applying water when handling materials, wetting or covering stored materials, and installing wind barriers to <br /> limit VDE- Also, limiting vehicle speeds, loading haul trucks with a freeboard of six inches or greater along <br /> Northern Region Central Regigil Q�iice <br /> 4230 Kiernan SaulE�crti Rr'.gion O({icy <br /> A�E'�3�i[t, Suite 1 3� 1990 fact Grltl�;Shur�Ave Lv! 2700 "w1" 4irt�t�l, 5uiW 27.5 <br /> Modesto, CA 95356-932 1 Fresno, CA 9372E)-0244 Bal:erSkde l CN 93301-2373 <br /> (209) 557-6400 ♦ FAX (20x)1 557-()4?5 (55 1) 230-0040 • FAX (559) 230-60(72 (061) -}2#i-6900 s FAX koo1) .326-6985 <br />