I <br /> STAFF REPORT - Quarr Excavation <br /> y i <br /> Application Information <br /> Owner: KRC Aggregate, Inc. i <br /> 1 <br /> Applicant: KRC Aggregate, Inc. ;F <br /> File Number: ER-94-1, QX-94.2 <br /> Location: On the north side of Brandt Road, at its easterly point of termination, <br /> approximately seven miles east of State Route 88, southeast of Clements. _ <br /> Address: 24717 E. Brandt Road, Lodi h <br /> General Plan: A/G, OS/RC Community: <br /> Zoning; AG-80 APN: 230-3 60-02,03; <br /> 230-190-01,02; <br /> 230-170-09 <br /> Project Size: 1048 acres (500 acres Parcel Size: 1100-acres <br /> to be excavated) <br /> Water Supply: Private well Sewage Disposal: Septic system <br /> Storm Drainage: Natural, retention ponds 100-Year Flood: No <br /> Williamson Act: Yes, Supervisorial District: 4 j <br /> Staff: Kerry Sullivan CEQA Determination: EIR <br /> Project Description <br /> w The applicants, KRC Aggregate, Inc., are proposing to expand the limits of excavation of an existing <br /> permitted quarry excavation (QX-86-1). The existing quarry operations encompass approximately 110 <br /> acres-the original 100 acres permitted under QX-86-1 plus 10 acres permitted by administrative approval <br /> under the provisions contained in Development Title Section 9-854.7. The proposed expansion will add <br /> an additional area of 938 acres, for a total area under permit of 1048 acres. Of the 1048-acre total area, <br /> the actual acreage to be excavated is 500 acres. F <br /> Aggregate resources will be excavated up to a depth of 40 feet, with the average depth to be excavated <br /> of approximately 25 feet. Sand and gravel deposits will be excavated by first removing all of the available <br /> topsoil in the respective phase being worked with a Caterpillar wheel tractor-scraper. The topsoil will then <br /> either be stockpiled for future reclamation or respread on a previously excavated area for reclamation and <br /> revegetation. Overburden is then excavated and either stockpiled or respread for reclamation. <br /> The applicants expect production to continue in the range of 500,000 to 1,000,000 tons per year, for a <br /> total amount of sand and gravel to be excavated of 25,000,000 tons over a 20- to 25-year period. <br /> Excavation will be conducted in four 5-year phases; each phase is composed of approximately)00 acres <br /> to be excavated. Reclamation and revegetation of the site will also be phased. As excavation of Phase <br /> 1 is completed and excavation of Phase 2 begins, reclamation and revegetation of Phase 1 will <br /> commence. All drainage from excavated areas will remain on the site. <br /> Waste materials produced from the processing operation are limited to clay and fine silts suspended in <br /> the process water. Process water is recycled back through a series of three recycling/settling ponds, <br /> where clays and fine silts settle out. The water is recycled and used as process water for the plant. i <br /> San Joaquin Count <br /> q Y QX-94-2/KRC Aggregate <br /> Community Development page 1 <br /> r <br /> 'i J <br />