U <br /> 5. Survey nests during spring or early summer (April-July) before the start of each phase of mining <br /> activities near any of the six identified nest sites. <br /> 6. Consult with the Department of Fish-and Game if an active Swainson's hawk nest is found within <br /> 0.5 mile of the disturbance site. <br /> 7. Set aside approximately 75 acres (0.75:1 ratio) of suitable hawk habitat outside the area of <br /> excavation. <br /> NEIGHBORHOOD OPPOSITION: <br /> Prior to preparation of the EIR, 23 letters in opposition to this project were received. During the <br /> preparation of the EIR, Notices of Preparation (NOP) were sent to all surrounding property owners and <br /> all of the people who sent letters of opposition. Two letters were received from people in the area <br /> regarding the NOP. When the Draft EIR was published, the same people were sent notices of availability <br /> and invited to attend the public hearing on the Draft EIR. No one responded to this notice, there were <br /> no requests for copies of the Draft EIR, and no one attended the hearing. Issues of concern raised by <br /> the opponents are as follows: impacts to surface water from sediment, dust, truck traffic, noise, <br /> compliance with conditions of existing permit, potential haul route on Acampo Road, and impacts on <br /> ground water. <br /> San Joaquin County QX-94-2/KRC Aggregate E.r� <br /> Community Development Page 13 <br />