Laserfiche WebLink
Megan Aguirre, Project Manager <br /> Page 2 <br /> August 24,2015 <br /> • Upon completion of any development that changes existing Special Flood Hazard Areas, <br /> the NFIP directs all participating communities to submit the appropriate hydrologic and <br /> hydraulic data to FEMA for a FIRM revision. In accordance with 44 CFR, Section 65.3, <br /> as soon as practicable,but not later than six months after such data becomes available, a <br /> community shall notify FEMA of the changes by submitting technical data for a flood <br /> map revision. To obtain copies of FEMA's Flood Map Revision Application Packages, <br /> please refer to the FEMA website at http://www.fema.gov/business/nflp/forms.shtm. <br /> Please Note: <br /> Many NFIP participating communities have adopted floodplain management building <br /> requirements which-are more restrictive than the minimum federal standards described in 44 <br /> CFR. Please contact the local community's floodplain manager for more information on local <br /> floodplain management building requirements. The Stockton floodplain manager can be reached <br /> by calling Ed Short, Senior Plans Examiner, at(209) 937-7630. The-San Joaquin County <br /> floodplain manager can be reached by calling John Maguire, Engineering Services Manager, at <br /> (209) 468-3063. <br /> If you have any questions or concerns,please do not hesitate to call Jane Hopkins of the <br /> Mitigation staff at(510) 627-7183. <br /> Sincerely, <br /> Gregor lackbum, CFM, Branch of <br /> Floodplain Management and Insurance Branch <br /> cc: <br /> Ed Short, Senior Plans Examiner, City of Stockton <br /> John Maguire,Engineering Services Manager, San Joaquin County <br /> Ray Lee, WREA, State of California,Department of Water Resources,North Central Region <br /> Office <br /> Jane Hopkins,NFIP Planner,DHS/FEMA Region IX <br /> Alessandro Amaglio,Environmental Officer, DHS/FEMA Region IX <br /> w Sem gov <br />