Laserfiche WebLink
I j <br /> t <br /> g. A County Service Area shall be formed prior to the approval of the Final Map to provide <br /> for the operation, maintenance, and improvement of storm drainage, water, and street <br /> lighting facilities. (Development Title Section 9-1100.5) <br /> h. The Traffic Impact Mitigation Fee will be required when the parcels are developed. The <br /> fee is due and payable at the time of building permit application. The fee currently is <br /> $3,175.00 per single-family dwelling unit in the Lodi area The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published C <br /> by the Engineering News Record. (Resolutions R-90-304 and R-91-1025) <br />!' I. This subdivision is approved for recording as a single unit Phasing is not approved. <br /> (Development Title Section 9-1100.3) <br /> j. A Preliminary Soils Report is required in accordance with County standards for the <br /> f purpose of determining the R-Value for the design of the roads. (Development Title <br /> Section 9-910.2) <br /> k. All utilities shall be underground except power transmission facilities of 35 KV or greater. <br /> Public utility easements shall be provided along the road frontage of the subdivision and <br /> as required by the public utility companies. (Development Title Section 9-1155.2) <br /> i <br /> t I. A grading plan shall be part of the Improvement Plans and shall contain the information <br /> listed in the U.B.C., Appendix, Chapter 70, Section 7006(1), with complete drainage <br /> details and elevations of adjacent parcels. Retaining wail details shall be submitted where <br /> applicable. Grading in excess of 5,000 cubic yards shall comply with Section 7014 for <br /> EEngineered Grading Requirements.' <br /> m. The subdivider shall agree to and shall pay user fees for the utility services from the time <br /> improvements acre accepted by the County until the lots are placed on the County tax <br /> rolls, or up to an 18-month period, as the case may be. (Subdivision Map Act Section <br /> 66493) <br /> n. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control <br /> I Devices and San Joaquin County standards, and they shall be shown on the <br /> improvement plans. (Development Title Section 9-1150.2) <br /> o. Access rights shall be dedicated and restricted for Lots 1, 2, and 14 along the frontage <br /> of Callmyrna Road. (Development Title Section 9-1150.5) <br /> 3. PUBLIC HEALTH SERVICES: (Staff Contact: Hector Castro, 468-3420) <br /> a. A soil suitability study indicating that the area is suitable for septic tank usage must be <br /> performed prior to approval of the Final Map, as required by Section 9-1105.2(d) of the <br /> San Joaquin County Development Title. A nitrate loading study is required, and a review <br /> fee of$390.00 must be paid at the time of submittal to the Environmental Health Division. <br /> V the nitrate loading study does not mitigate the first groundwater impacts from the added <br /> septage load, a revised application will be required to show larger parcels and a public <br /> water system. <br /> San Joaquin County SU-92-6/Acampa Estates <br /> Community Development Page 8 <br /> i <br />