My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7500
>
3500 - Local Oversight Program
>
PR0544801
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:02 AM
Creation date
9/4/2019 10:49:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544801
PE
3528
FACILITY_ID
FA0003210
FACILITY_NAME
TEXACO TRUCK STOP
STREET_NUMBER
7500
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25015018
CURRENT_STATUS
02
SITE_LOCATION
7500 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!I <br /> Response to SJCPHS Com VIS on Extended Site Charact. Wk Pin, 7500 W St., Tracy Page 3 <br /> CLOSURE OF WELLS AT 7474 WEST ELEVENTH STREET <br /> Thank you for informing us that the monitoring wells and the old water-supply well formerly <br /> located at 7474 West Eleventh Street have been destroyed. We will locate the new well at that <br /> address and show it on our site plan. <br /> REQUIREMENT TO RECEIVE AUTHORIZATION FROM USTCF TO EXPEND ADDITIONAL FUNDS FOR <br /> EXTENDED SITE CHARACTERIZATION <br /> On August 31, 2001, our clients, Mr. And Mrs, Carl Navarra, received authorization from the <br /> USTCF to prepare the work plan and implement the extended site characterization program <br /> therein based on our cost estimates for that program. Subsequently, we completed the work plan <br /> that you have reviewed for less than the budgeted amount. However, the USTCF, although they <br /> approved our estimate, require Mr. and Mrs. Navarra to obtain bids for the drilling, well <br /> I� - installation. and °.aboratory- workrregLired=for..the extended•site-characterizatioh-program'.-They •--- ++ <br /> process of preparing specifications and obtaining bids for that work has been initiated. Due to <br /> your request for the installation of an additional well, our original estimate will now be invalid. It <br /> will be necessary to reapply to the USTCF for authorization to expend the additional funds now <br /> required. <br /> We will prepare a new estimate for consideration by the USTCF when Mr. and Mrs. Navarra <br /> have received responses to their requests for bids for drilling, well installation and laboratory <br /> work. If the USTCF approves the additional expenditures, we will contact you to schedule the <br /> field work for the extended site characterization program. <br /> Sincerely, <br /> Dai Watkins, PhD, P.E. 77 <br /> President <br /> The San Joaquin Company Inc. <br /> cc. Mr. and Mrs. Carl Navarra <br /> Ei <br />
The URL can be used to link to this page
Your browser does not support the video tag.