My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7500
>
3500 - Local Oversight Program
>
PR0544801
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/4/2019 10:50:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544801
PE
3528
FACILITY_ID
FA0003210
FACILITY_NAME
TEXACO TRUCK STOP
STREET_NUMBER
7500
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25015018
CURRENT_STATUS
02
SITE_LOCATION
7500 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG-31-2001 10:46 UST CLEANUP FUND 316 227 4530 P.02iO3 <br /> Carl Bart Navarro -2- August 31,2001 <br /> Claim No. 14167 <br /> # Task* Amount Pre—Approved Comments <br /> 6 Includes 1 - 0.5in.push probe, 3 - <br /> 25ft wells, 1 - 35ft well, 1 —40 ft <br /> well, 1 --60 ft well. Contingency <br /> and standby costs($675)are not <br /> Drilling,well installation, 8,315 pre-approved. If it becomes <br /> sampling necessary to use these costs, the <br /> Fund will reimburse reasonable <br /> and necessary costs with <br /> justification. <br /> 7 Lab analysis 7,585 <br /> 8 Site characterization report 4,641 <br /> TOTAL PRE-APPROVED $28,4751 <br /> " Task descriptions are the same as those identified in San Joaquin Co.'s cost estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additionaI tasks and costs are necessary and reasonable. <br /> • The work products must be acceptable to the Regional Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the The San Joaquin Co.proposal in my pre-approval above, <br /> please be aware that you will be entering into a private coiatma: the State of California <br /> cannot compel you to sign any specific contract. This letter pre-approves the costs as <br /> presented in the The San Joaquin Co. proposal dated, submitted by the claimant on August 1, <br /> 2001, for conducting the work directed by the County. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action, <br /> Work. If you need assistance in procuring contractor and consultant services, do not hesitate to <br /> call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Rcimbim5ement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> CaGforaia EaYironmental PrWec&ew A prag <br /> P.a 1,R.eycJedF"W, <br />
The URL can be used to link to this page
Your browser does not support the video tag.