Laserfiche WebLink
C._ PERCOLATION TEST BORINGS AND TEST RESULTS <br /> On October 9,-2007; shallow and deep percolation test borings were drilled on each of the six/ <br /> proposed Parcels using a truck-mounted Mobile Drill Rig and 4.5 inch O.D. solid stem auger. <br /> Percolation test boring locations Were located equidistant between each east-west property line and <br />- 150 south of pr000sed Sorrenti Lane.'This is the probably the most logical location for any future <br /> residential development o occur. <br /> SSS§ 6.2,.6.3, 6.4,6.5 After drilling the shallow perc test borings,the sidewalls were scored with a <br /> pry-bar-and the loose material removed with a hand auger. The deeper test borings could not be <br /> f` scored due to the corresponding depths involved. Two inches of fine gravel was placed at the bottom <br /> and three-inch perforated PVC pipe was in in each boring. Each boring was then presaturated <br /> with appro tely 12 inches of water. <br /> Ori October 10 07 0900 hrs percolation-testing commenced for Parcels)3 -hrou After testing, <br /> p g9? <br />