Laserfiche WebLink
j. The Traffic Impact Mitigation Fee will be required when the parcels are developed_ 'The <br /> fee is due and payable at the time of bUlding permit'application. The fee currently is <br /> 3Z38Z00 per single-family dwelling unit'in the Stockton area The fee shall be <br /> automatically adjusted .July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record (Resolutions R-90-304 and R-91-1025) <br /> k. The Water Supply Facilities Impact Mitigation Fee will be required when the parcels are <br /> Developed. The fee is due and payable at the time of building permit application. The <br /> fee currently is$1,069.00 per single-family dwelling unit'. If no building permit is required, <br /> the fee will be exempt The fee shall be automatically increased on January 1 of each <br /> year at the rate of 6.9 percent. An additional 3.5 percent shall be added to the fee upon <br /> payment for processing and administering the program. (Resolution R-91-327) <br /> I. r2% ustment to improvements shall be made to provide far two-way traffic and `cr <br /> temCariary cut-de-sacs as Weil as utility systems modifications to conform to County <br /> s"anCarCs where the subdivision is to be recorded in phases. (Cevelcpment i itle Sec:icn <br /> re!iminarf Sails Re,ort is recuired in accordance with taunry standards far tt ae <br /> -urrese of ce:ermining the R=Value far t~e design of the roads. (Cevelacment i',tle <br /> Sec:;cn <br /> Ili -..1 �Ti!I[ieS S a!I �,e L'r cergrcund excac pCwer tranSmissicn fac: <br />