My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012380
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CARPENTER
>
2482
>
2600 - Land Use Program
>
PA-1900132
>
SU0012380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2020 8:13:43 AM
Creation date
9/4/2019 10:55:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012380
PE
2631
FACILITY_NAME
PA-1900132
STREET_NUMBER
2482
Direction
E
STREET_NAME
CARPENTER
STREET_TYPE
RD
City
STOCKTON
Zip
95205-
APN
17914018
ENTERED_DATE
6/19/2019 12:00:00 AM
SITE_LOCATION
2482 E CARPENTER RD
RECEIVED_DATE
6/24/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\C\CARPENTER\2482\PA-1900132\SU0012380\APPL.PDF \MIGRATIONS\C\CARPENTER\2482\PA-1900132\SU0012380\CDD OK.PDF \MIGRATIONS\C\CARPENTER\2482\PA-1900132\SU0012380\EH COND.PDF \MIGRATIONS\C\CARPENTER\2482\PA-1900132\SU0012380\PROJECT DESCRIPTION.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PG&E Agreement <br /> Enel + PG&E <br /> OverviewPress Release from PG&E Enel+PG&E Agreenient <br /> ••• Enel and Pacific Gas and Electric executed <br /> a 20 year Power Purchase Tolling <br /> Agreement in 2017 <br /> `" '�'•r °^^^ ^� Enel to develop, construct, and operate a 25 <br /> MW/100 MWh energy storage plant and <br /> M.r.1�r,7s , w•,,,,,,,,,,,,,, provide Resource Adequacy(Reliability to <br /> �i:twmtarrr!eLw,iM '.ee n,;.rx"=t - PG&E) <br /> ..�d.sw,Y i!f .,,_.,. ,,.,.. • As PG&E's territory increases renewables <br /> including solar and wind, energy storage <br /> w W qm oawa a.r umc asw s+t <br /> NrMrl•wrp•ir*WMM ,,,_�,,,,,, needed to balance intermittent generation <br /> .rw/.rh W�111.!Wtir�l.r <br /> ""�« •'«"" •�« ""°"" and provide reliable energy in the greater <br /> Stockton area <br /> 101[1M•!I.rObt•IJEr Yn/plq�L <br /> r1lrryr�r•A Nn4'$tYm F.i <br /> M.�rp.wrr•srrYO�.rd f Iir.R1 M�i� <br /> IMpr■WMIMerMr/l1�Ir/rMry `.+sr.?+ <br /> Ir hwwr�ffl.lGEh.rltlrrtlwwrl• <br /> �arr�wwwrnrrs67 •wawm>rt, <br /> rlrl�ll•r.1M/rYrWI rI.Wr •:,rr911k .. <br /> 22107/2019 Enel Global Thermal Generation:SO STORAGE CONFIDENTIAL - <br /> Safety on Site C HCl <br /> Enel Safety Division and Energy Storage Specifics <br /> • Safety is Enel's#1 Priority— Enel has Health and Safety Department that monitors and <br /> controls construction, operation,and maintenance of facilities. Enel Green Power North <br /> America has a Health, Safety, and Environment management system certified to OSHAS <br /> 18001 and ISO 14001 <br /> • Enel will comply with all required guidelines including National Fire Protection Agency <br /> 855: Energy Storage Systems which are currently being drafted <br /> • Energy Storage System will be remotely monitored 24/7/365 with automated control/ <br /> shutdown capabilities <br /> • HVAC and Fire Suppression System will be included with system. If Tesla system <br /> installed, liquid cooling and automated electrical isolation will be deployed. <br /> • Enel group company Demand Energy (now incorporated with EnelX) installed first ever <br /> lithium ion battery in New York City, 1.2 MWh at the Marcus Garvey micro-grid Project <br /> following New York City Fire Dept. approval on project <br />
The URL can be used to link to this page
Your browser does not support the video tag.