My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011743
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7500
>
3500 - Local Oversight Program
>
PR0544801
>
ARCHIVED REPORTS XR0011743
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:08 AM
Creation date
9/4/2019 10:58:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011743
RECORD_ID
PR0544801
PE
3528
FACILITY_ID
FA0003210
FACILITY_NAME
TEXACO TRUCK STOP
STREET_NUMBER
7500
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25015018
CURRENT_STATUS
02
SITE_LOCATION
7500 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Extended Site Characterization Report: 7500 West Eleventh Street, Tracy, CA. Page 17 <br /> additional or alternate samples to be obtained as was appropriate to accomplish the <br /> f'r objectives of the site characterization program. <br /> !'.= Following sample recovery, each sample tube was cleaned externally, its ends covered <br /> with Teflon foil and closed with tightly-fitting plastic caps secured with adhesive-less <br /> tape. Each sample tube was then labeled for identification, entered into chain-of-custody <br /> control and packed on chemical ice for transport, within 10 hours, to Severn Trent <br /> Laboratories, hic.'s (STL) Pleasanton, California laboratory. <br /> In the case of small-diameter exploratory borings PP-15 and PP-16, a 0.5-in. push probe <br /> was mounted on the drilling rig and used to advance the borings into the subsurface. <br /> F.: Except where there was no recovery, soil samples were also recovered from those borings <br /> at approximate 5-ft. intervals using a 4-ft long, split-spoon sampling tool with a %-inch <br /> diameter Teflon liner. <br /> 5.6 Analyses of Soil Samples <br /> Each soil sample submitted to the laboratory was analyzed for the following suite of <br /> analytes. <br /> L.. <br /> Analyte Method of Analysis <br /> Total Petroleum Hydrocarbons EPA Method 8015M <br /> (quantified as Diesel) <br /> Total Petroleum Hydrocarbons EPA Method 8015M <br /> '- (quantified as Gasoline) <br /> f =J <br /> Benzene EPA Method 8021B <br /> Toluene EPA Method 8021B <br /> -� Ethyl benzene EPA Method 8021B <br /> Total Xylene Isomers EPA Method 8021B <br /> -'' STL's laboratory is certified by the California Department of Health Services (DHS) to <br /> perform each of the analytical methods cited above and all other test methods used to <br /> ' obtain the analytical results cited in this report. <br /> I <br /> The results of the soil analyses are compiled in Table 3, which also includes all historical <br /> soil analysis data. <br /> 5.7 Disposal of Drill Cuttings <br /> Drill cuttings from the well and exploratory borings were retained in 55-gal. steel drums. <br /> __' sic <br />
The URL can be used to link to this page
Your browser does not support the video tag.