My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011751
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7500
>
3500 - Local Oversight Program
>
PR0544801
>
ARCHIVED REPORTS XR0011751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:08 AM
Creation date
9/4/2019 11:03:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011751
RECORD_ID
PR0544801
PE
3528
FACILITY_ID
FA0003210
FACILITY_NAME
TEXACO TRUCK STOP
STREET_NUMBER
7500
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95378
APN
25015018
CURRENT_STATUS
02
SITE_LOCATION
7500 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan for Refined Plume Definition and Management of Floating Product-7500 W 11th St., Tracy, CA. Page 34 <br /> j <br /> ,i- 8.8 Groundwater Elevations and Measurement of Thickness of Floating Product <br /> After a delay of at least one week following well development, the depth from the top of the <br /> casing to the water table will be measured using a groundwater-floating product interface <br /> detection probe. That instrument will also record thickness of floating product in the well. <br /> The measurements will be recorded and included in the quarterly groundwater-quality reports <br /> that are filed with the SJCEHD. <br /> Note: <br /> As discussed in Section 5.2.1, the actual thickness of floating product in the <br /> formation is generally less than the thickness of floating product measured in a <br /> well. <br /> 8,9 Schedule <br /> The floating product monitoring wells will be installed during the same construction period <br /> as the groundwater-quality monitoring wells. Measurement of LNAPL thickness in those <br /> wells will also be scheduled to coincide with groundwater-quality monitoring and will be <br /> reported in the engineering report that will be published within 60 days following receipt of <br /> the analytical result from the first monitoring round. <br /> Thereafter, floating product thicknesses will be measured during future, scheduled rounds of <br /> groundwater-quality monitoring. <br /> 8.10 Cost Estimate <br /> The estimated cost of the floating-product monitoring program is included in that for refined <br /> groundwater plume definition and groundwater-quality monitoring presented in Section 7.10. <br /> It <br /> sic <br />
The URL can be used to link to this page
Your browser does not support the video tag.