My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011784
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CARTER
>
30636
>
2600 - Land Use Program
>
PA-1500200
>
SU0011784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:25 AM
Creation date
9/4/2019 11:04:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011784
PE
2633
FACILITY_NAME
PA-1500200
STREET_NUMBER
30636
Direction
E
STREET_NAME
CARTER
STREET_TYPE
RD
City
ESCALON
Zip
95230-
APN
20708004
ENTERED_DATE
5/1/2018 12:00:00 AM
SITE_LOCATION
30636 E CARTER RD
RECEIVED_DATE
5/1/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Supplemental fields
FilePath
\MIGRATIONS\C\CARTER\30636\PA-1500200\SU0011784\APPL.PDF \MIGRATIONS\C\CARTER\30636\PA-1500200\SU0011784\EH PERM.PDF \MIGRATIONS\C\CARTER\30636\PA-1500200\SU0011784\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Megan Aguirre,Project Manager <br /> Page 2 <br /> May 29, 2018 <br /> • All buildings constructed within a coastal high hazard area, (any of the"V"Flood Zones <br /> as delineated on the FIRM),must be elevated-on pilings and columns, so that the lowest <br /> horizontal structural member,(excluding the pilings and columns),is elevated to or above <br /> the base flood elevation level. In addition,the posts and pilings foundation and the <br /> structure attached thereto, is anchored to resist flotation, collapse and lateral movement <br /> due to the effects of wind and water loads acting simultaneously on all building <br /> components. <br /> C Upon completion of any development that changes existing Special Flood Hazard Areas, <br /> the NFIP directs all participating communities to submit the appropriate hydrologic and <br /> hydraulic data to FEMA for a FIRM revision. In accordance with 44 CFR, Section 65.3, <br /> as soon as practicable,-but not later than six months after such data becomes available; a <br /> community shall notify FEMA of the changes by submitting technical data for a flood <br /> map revision. To obtain copies of FEMA's Flood Map Revision Application Packages, <br /> please refer to the FEMA website at http://www.fema-gov/business/nfip/forms.shtm.. <br /> Please Note: <br /> Many NFIP participating communities have adopted floodplain management building <br /> requirements which are more restrictive than the minimum federal standards described in 44 <br /> CFR. Please contact the local commuirity's floodplain manager for more information on local <br /> floodplain management building requirements. The Escalon floodplain manager can be reached <br /> by calling Carol Norris,Interim City Planner,at(209) 691-7430. The San Joaquin County <br /> floodplain manager can be reached by calling John Maguire,Engineering Services Manager, at <br /> (209) 953-7617. <br /> If you have any questions or concerns,please do not hesitate to call Brian Trushinski of the <br /> Mitigation staff at(510) 627-7183. <br /> Sincerely, <br /> Gregor Blackburn, CFM,Branch Chief <br /> Floodplain Management and Insurance Branch <br /> www.fema.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.