Laserfiche WebLink
2 . Traffic and circulation (estimated number of trips and peak hour trips) : <br /> acr..eaa .� `) Ty-,pn <br /> VYm -qfAllOrT 5�7-t X '7, S-3 a <br /> 3 . Noise: xA 5-*-� A44 Ait�4) <br /> a. <br /> Noise sensitive uses: Is property within 60dBA or greater contour <br /> as defined by City of <br /> Stockton Noise Element Contour Maps? <br /> 6 C7 -- q° v!3 <br /> b. Noise generating uses: <br /> 1. What are anticipated noise levels of project at property line? <br /> 2 . Is noise generated by use anticipated to significantly raise <br /> ambient level? <br /> 4 . Air Quality_: <br /> a. Will the project contribute significant amounts of air pollutants <br /> such as dust, smoke or odors? If so, specify. <br /> AIP <br /> b. Will the project generate significant amounts of air pollutants due <br /> to motorIvehicle usage? If so, specify. <br /> 5. Will the project adversely affect animal or plant life on or near the <br /> site? If so, specify. <br /> A/b <br /> 6. Will the project use abnormally large amounts of natural gas, <br /> electricity or other energy source? If so, specify. <br /> No <br /> 7 . Will the project contribute to the loss of viable agricultural lands or <br /> interfere with agricultural operations? <br /> /tJR <br /> 8 . Governmental bodies or departments having discretionary approval or <br /> authority over the project and the type of permit or approval required <br /> by each body. AfrO✓" <br /> &44 C' :P 017-► ��� <br /> g . Any other impacts or comments regarding the environmental effect of this <br /> project. <br /> No <br /> -4- <br />