Laserfiche WebLink
- <br /> °PQu�N COUNTY OF SAN JOAQUIN <br /> 2.' THOMAS R, FL[NN <br /> Z� DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKfON.CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> 209/468-3000 STEVEN WINKLER <br /> FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> April 15, 1998 <br /> MEMORANDUM <br />� TO: Thomas M. Gau, Senior Civil Engineer APR 16 1998 <br /> Community Development' ent <br /> CONTACT PERSON Kerry Sullivan "MMUn'Al Development Dem, <br /> FROM: Gabriel Karam, Senior Civil Engineer Gk- <br /> Public Services Division <br /> SUBJECT: GP-98-2 (PREAPPLICATION) A GENERAL PLAN MAP AMENDMENT <br /> PREAPPLICATION TO CHANGE THE GENERAL PLAN DESIGNATION OF A <br /> 21,900 SQUARE-FOOT PARCEL FROM CIC (COMMUNITY COMMERCIAL) TO <br /> C/G(GENERAL COMMERCIAL), LOCATED ON THE NORTHEAST CORNER <br /> OF CHEROKEE LANE AND MYRAN AVENUE,NORTHEAST STOCKTON. <br /> (DISTRICT 2). <br /> APPLICANT: John M. Harris, et al APN: 119-240-12 <br /> r. <br /> INFORMATION: <br /> The site is not currently located within a.Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. In addition, the existing San Joaquin County and City of Stockton Flood Insurance <br /> Studies, which delineate flood risks, floodplains, and floodway areas, are currently being reevaluated. <br /> The reevaluation is being conducted by the Federal Emergency Management Agency, Region IX, <br /> Building 105, Presidio of San Francisco, California 94129-1250, telephone (415) 923-7186. The <br /> reevaluation may delineate additional flood risks. The official flood maps are available for review at the <br /> Department of Public Works, 1810 East Hazelton Avenue, Stockton. These flood maps will be updated <br /> when the'reevaluation process is completed, <br /> Cherokee Lane has an existing right-of-way width of 100 feet and a planned right-of-way width of <br /> 110 feet. Myran Avenue has an existing right-of-way width of 40 feet and a planned right-of-way width <br /> of 50 feet. <br /> RECOMMENDATIONS: <br /> None. <br /> GK:RH:gn <br /> PS-eb 102.G5 <br /> E: Manuel Lopez, Deputy Director/Development <br /> 4 <br />