Laserfiche WebLink
SITE PI 4N <br /> • <br /> USE PERMIT PLAN FOR z �� �n s sb <br /> m zt .1" 1 � B� ����� 111 <br /> o <br /> LKO DISMANTLING fo N G <br /> STOCKTON , CALIFORNIA o <br /> os <br /> p� " ocl QVFES I, <br /> N`��� � <br /> �, <br /> PROJECT . • ' DoE �c1T3 <br /> LOCATION oma` T <br /> � y slgr CAV O��p <br /> zzr <br /> 1 <br /> 65 <br /> \vp �O �v``�OO• _ \ W <br /> `` <br /> a <br /> per e% , , <br /> :1 <br /> O <br /> f ¢ <br /> 1 <br /> i sib . <br /> 1 x � <br /> l 5 ✓ <br /> VICINITY MAP <br /> NTS <br /> PARKING CALCULATIONS o <br /> N N <br /> =_ STRUCTURE PROPOSED USE GROSS FLOOR OVERALL PROPOSED PROPOSED PROPOSED <br /> ^T AREA (SO �) BUILDING <br /> HEIGHT PSA KING SPARKNGD APARKINGE o <br /> r i \ PROPOSED BUILDING WAREHOUSE/OFFICE 400,000 44 63 184 6 <br /> "'K <br /> *BASED <br /> *BASED ON THE EXPECTED USE OF THE FACILITY, THE PROPERTY OWNER WILL BE REQUESTING A DEVIATION <br /> \ ` A� FROM THE COUNTY PARKING REQUIREMENTS. <br /> Rlk <br /> FLOOD PLAIN NOTE <br /> b <br /> THE BUILDING PAD AND IMMEDIATE PARKING AREA SURROUNDING THE BUILDING WILL BE FILLED TO <br /> \� C APPROXIMATELY EL 26.6 (NGVD 29), EL 29 (NAVD88), TO RAISE THE BUILDING PAD ABOVE THE 100 YEAR <br /> BFE, UTILIZING FILL GENERATED FROM THE SITE WITHIN THE CURRENT 100 YEAR FLOOD PLAIN LIMITS. THIS = <br /> SCENARIO WILL R-SULT IN A NET-ZERO IMPACT TO THE FLOOD PLAIN, AND WILL REMOVE THE BUILDING <br /> ' ( '\\ ,. FROM THE 100 YEAR FLOOD PLAIN. THE PROPOSED FILL OPERATION WILL REQUIRE APPROXIMATELY 75,000 <br /> �\ CUBIC YARDS BASED ON PRELIMINARY ANALYSIS, BUT IS SUBJECT TO CHANGE BASED ON FINAL ANALYSIS. <br /> ALL FILL WITHIN HE FLOOD PLAIN WILL BE PERFORMED IN ACCORDANCE WITH FEMA REQUIREMENTS. <br /> ,t, \A FIRM PANEL NUM13ER: 0460E <br /> ° \ MAP NUMBER: 06077C0460F <br /> U. <br /> r4 �I.c' C.. . •\;, hf� , .. ,iii ' i °AV �`' <br /> I <br /> ! ' <br /> c 4 <br /> i <br /> N16 58'04"W 204J.9J <br /> APIN <br /> —� —'�- -` -- `- — -- � LAND�7CNIMI,M OF <br /> NOTE <br /> WITHIN THE PERIMETER V <br /> — — <br /> / • '� <br /> • w <br /> r <br /> z ' <br /> f I e i (63)TRAILER PARKING PREPARED FOR <br /> WO <br /> CLIENT- � �� KP DEVELOPMENT <br /> � , �� u yam.N PROJECT LOCATION _ <br /> ei" <br /> � - � �, �i � \ 8025 FORS"1 H BLVD � <br /> /� •` \� O� ST. LOUIS, JO 63105 <br /> // ,4 - i <br /> �, O CO a A i`i..` 6� Z i_ <br /> N , F PROPOSED BUILDING �' .c� (314) 261 7363 SITE ADDRESS: C— <br /> /% <br />