My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011478 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLLIER
>
3222
>
2600 - Land Use Program
>
PA-1700166
>
SU0011478 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:11 AM
Creation date
9/4/2019 11:26:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0011478
PE
2611
FACILITY_NAME
PA-1700166
STREET_NUMBER
3222
Direction
E
STREET_NAME
COLLIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
00514607
ENTERED_DATE
8/29/2017 12:00:00 AM
SITE_LOCATION
3222 E COLLIER RD
RECEIVED_DATE
8/28/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COLLIER\3222\PA-1700166\SU0011478\SS STUDY ADDENDUM.PDF \MIGRATIONS\C\COLLIER\3222\PA-1700166\SU0011478\NL STUDY .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> I <br /> i <br /> I <br /> The length of satisfactory septic service and the number of repairs indicate no cause for concern is <br /> evident.A sand layer was detected on each of the four proposed parcels. <br /> GROUNDWATER INFORMATION <br /> 10-'0 The map Lines of Equal Depth to Groundwater indicate approximately 45 feet to static water and <br /> y' the gradient is westerly, <br /> yy The existing well water was tested by FarWest Labs Inc., and the results are 23.0 mg/1 Nitrates <br /> and<0.01 ug/L DBCP. These results are satisfactory. <br /> No third party is involved in the sampling and testing. The log of the sampling is included. <br /> `-' SOIL PROFILE INFORMATION <br /> The soil profile was determined by observing the material as it is excavated by the driller.No pit <br /> j� was dug. The profile in general is as follow: <br /> I <br /> Flit 0-6 Hard pan <br /> 6-10 clay <br /> FA, 0-13' Silty Sand <br /> _4 13-25 Silty Clay <br /> �'•S' Pits are required to reach the sand layer. The leach lines will be in hardpan. <br /> PERCOLATION TEST INFORMATION <br /> rThe surveyor's map shows the precise location of the four test holes. Three holes were augured <br /> G• A on each parcel. Holes were drilled by a truck mounted augur on 10/25/05. The holes were sleeved <br /> g with PVC pipe after 2" of gravel was placed in the bottom of the hole. Additional gravel was <br /> ro' <br /> placed around each PVC pipe up to approximately 6". (See protocol sheet diagram)The 24 hour <br /> ' pre-soak began on 10/27/05. The shallow holes received 12"of water and the deep test hole <br /> G y received 6" of water. <br /> The 4 hour testing began at 0900 on 10/28/05. All holes were empty of water. All the shallow <br /> holes failed. All the deep holes passed. <br /> �{ G• The testing conformed to SJC Policy EHD 02-02. The EHD inspector was present for the <br /> " required readings. A battery operated meter was used for all readings. The readings were <br /> recorded on the EHD form. <br /> The test results indicate satisfactory conditions to support a on-site septic system for a SFR on <br /> each of the 4 parcels. A 6 000 SF leach field is required on each of the 4 parcels. <br /> P � q <br /> ! I <br /> 2. <br /> F <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.