My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011478 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLLIER
>
3222
>
2600 - Land Use Program
>
PA-1700166
>
SU0011478 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:11 AM
Creation date
9/4/2019 11:26:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0011478
PE
2611
FACILITY_NAME
PA-1700166
STREET_NUMBER
3222
Direction
E
STREET_NAME
COLLIER
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
00514607
ENTERED_DATE
8/29/2017 12:00:00 AM
SITE_LOCATION
3222 E COLLIER RD
RECEIVED_DATE
8/28/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COLLIER\3222\PA-1700166\SU0011478\SS STUDY ADDENDUM.PDF \MIGRATIONS\C\COLLIER\3222\PA-1700166\SU0011478\NL STUDY .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i' E <br /> F Reference Point (RP) Reference Point (RP7 <br /> Original Ground (OG} O+iginat Ground (Or.) <br /> v� <br /> Drill 6' (go. hole <br /> dia. MC pgre <br /> Win 4" dia. hole _ p <br /> <" d.4 �. IPIPC <br /> Drill 1/4"holes in PVC pipe o 0 0 <br /> p : oo <br /> O O O <br /> o • Gravel size 1/4"to 3/8" a o.o • m <br /> ,00.o; <br /> o _ OO. Z <br /> 111Y�� O O <br /> 1 a • - - 0 0 O <br /> t t•• • 2' ldm. Grovel <br /> JX <br /> 3 <br /> Threaded <br /> JC <br /> Connection oint SHALLOW HOLE (6�diQ-� <br /> WS <br /> Lift Hole <br /> V <br /> Drill- 1/4" holes in PVC pipe• m •ry <br /> h-m. <br /> t <br /> Gravel size 1/4"tln 3/8' <br /> ra (° Z 25 <br /> 2" Wn. Grovel. <br /> DEEP HOLE 4 7die. <br /> . <br /> pas <br /> 1. Sleeve the hole with PVC pipe-and grovel as soon as <br /> possible. after drilling. <br /> 2. Measure depth-prior torelease of. driller. Deep_holes <br /> holes must be cleaned out by the driller. Shallow <br /> holes (42' deep) can be cleaned out with 4" auger. <br /> 3. O.K..to place more gravel,on, the exterior of the <br /> PVC Sleeve. than the minimum that is shown. <br /> 4. Use a funnel to pour rater into the PVC pipe. <br /> ENGINEER: Earnest E_ Smith IHOLE PREPARATION (Deep/Shallow) AM D1aj"—l" --0 <br /> Form r W%iwmd to,0115 6--2&0 PERCOLATION TESTS DATE: /,0 2 S r cs` <br /> l ' <br /> ' - O <br />
The URL can be used to link to this page
Your browser does not support the video tag.