Laserfiche WebLink
Item No. 2 <br /> PC : 5-21-87 <br /> UP-87-12 <br /> Page 4 <br /> expected to have any effect on the overall retail operation. <br /> Current hours of operation are 7 :00 a.m. to 9: 00 p.m. , seven <br /> days a week. <br /> FACILITIES/SERVICES ; <br /> The existing market is served by an individual well and septic <br /> system. Storm drainage is accommodated by a roadside ditch along <br /> the south side of Collier Road and the west side of the frontage <br /> road. No changes are proposed under the gasoline sales Use <br /> Permit. Conditions of approval have been proposed by the <br /> Department of Public Works and the Local Health District to <br /> address sewage disposal and storm drainage. <br /> ENVIRONMENTAL CONSIDERATIONS: <br /> An Initial Study prepared for this project did not identify any <br /> significant environmental effects. On that basis, a proposed <br /> Negative Declaration has been prepared for the Planning <br /> Commission's approval . <br /> i <br /> 5 <br />