My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7675
>
3500 - Local Oversight Program
>
PR0544802
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:47 AM
Creation date
9/4/2019 11:28:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544802
PE
3528
FACILITY_ID
FA0005153
FACILITY_NAME
FAYETTE MANUFACTURING CORP
STREET_NUMBER
7675
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014012
CURRENT_STATUS
02
SITE_LOCATION
7675 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Canofti-etnvironmentat <br /> ESTIMATED BUDGET Canonie Environmental Services Corp <br /> FOR SUBSURFACE INVESTIGATION 1710 Main Street <br /> AT Escalon, California 95320 <br /> FAYETTE MANUFACTURING CORP. Phone: 209.838-3507 <br /> Phone: 800-926-0806 <br /> 7675 WEST ELEVENTH STREET Fax: 209-838-3509 <br /> TRACY, CALIFORNIA <br /> PAGE 1 OF 2 <br /> The estimated total budget is $14,624. The proposed scope of work is described in the attached <br /> letter. The estimated budget is valid for 30 days from the date of preparation: January 30, 1995. <br /> 1 <br /> Task 1: File Review Workplan Preparation Permitting and Scheduling <br /> o Labor $ 1,435 <br /> o Permit Fees/Mileage 216 <br /> Task 1 Total: $ 1,651 <br /> Task 2: Installation of Three Groundwater Monitoring Wells <br /> o Labor $ 850 <br /> o Equipment/Mileage 140 <br /> o Subcontractor 3,428 <br /> o Laboratory Analysis 450 <br /> Task 2 Total: $ 4,868 <br /> Task 3: Well Surveying, Monitoring Development and Sampling <br /> o Labor $ 500 <br /> o Equipment/Mileage 310 , - <br /> 0 <br /> 10 , -o Laboratory Analysis 225 <br /> Task 3 Total: $ 1,035 <br /> Task 4: Report Preparation <br /> 0 Labor $ 1,540 <br /> Task 4 Total: $ 1,540 <br /> m:\proposal\P90547.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.