Laserfiche WebLink
SMTH <br /> C, within the standard turn-around-time. -Purge water from the wells will be contained on-site in <br /> 55-gallon DOT approved drums pending laboratory analysis. If sample results indicate non- <br /> detectable levels of petroleum hydrocarbons, discharge to the ground surface is proposed. <br /> After laboratory results are received, a report will be prepared containing results of the <br /> monitoring and sampling activities. A draft copy will be prepared and submitted to the client <br /> for review. After comments are received, a final copy will be prepared for submittal to the <br /> - appropriate regulatory agencies. <br /> 6.0 PROJECTED SCHEDULE <br /> The well installation will-require two days to be completed. The field work can be scheduled <br /> when the necessary permits are obtained. Once the well installation and initial groundwater <br /> Lsampling are complete and all laboratory results have been received, the data will be analyzed <br /> and-the PAR will be prepared. It is anticipated that the PAR will be submitted for regulatory <br /> review during the third quarter of-1995. <br /> lw <br /> c <br /> 95122\WP-0695.doe 5 <br />