Laserfiche WebLink
ASS O C I ATE S I N C . <br /> i <br /> Report Preparation <br /> Upon completion of the well installation and development activities, a summary report will be <br /> prepared for submittal to PHS/EHD. The report will include a description of all field activities, <br /> laboratory analytical results, and well/boring logs. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with ATC's Site <br /> Safety Plan (SSP) contained in Attachment 1 and Quality Control/Quality Assurance Plan <br /> contained in Attachment 2. <br /> Projected Schedule <br /> Once approval of this workplan has been received, ATC will schedule drilling activities. ATC will <br /> notify PHS/EHD at least 48 hours prior to beginning any field activities. The summary report will <br /> be submitted to PHS/EHD approximately four to five weeks after the completion of field <br /> activities. <br /> If you have any questions or require additional information regarding this workplan, please <br /> contact us at (209) 579-2221. <br /> Respectfully submitted, <br /> ATC Associates Inc. p <br /> VGam- Ail, <br /> Drew Van Allen <br /> Staff Scientist <br /> oQR4FESSIp�y9 <br /> _ l <br /> JE N1�lE <br /> Jeanne Homsey, P.E. <br /> Registered Engineer No. C47410a= ft.�;"���' <br /> Attachments S�, CIV! �•�, <br /> cc: Dr. A.R. Glovers ;y <br /> Mr. Mark List, RWQCB <br /> w:\17861\reports\wkpweI.doc 4 <br />