Laserfiche WebLink
Y <br /> Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SU-97-05 (2 ND REVISED) <br /> C 4. Hewitt Road to the <br /> � <br /> e shall be improved ' ' along the frontage of <br /> Parcels 1 39 & 4 of Parcel Map Bk 21 Pg. 65 to County Standards for a 50 foot right-of-way <br /> rural road. The Existing DFIA-98-16 will hp rescinded upon acceptance of improvements. <br /> I (Development Title Section 9-1150.5(b)and DFIA-98-16) <br /> 5. Bmifisge ffern eseh pefeel an half of Navarre Gaui4 fFenting shall be retained ensite. <br /> I lew it,will b all.-ted. The study shall show that the n8ttlffll�sheet fl <br /> (DevelepmentTitle Section 9 1135-.2 <br /> Drainage from each parcel and half of Navarro Court fronting it shall be retained on-site or <br /> San Joa uin Coun maintained retention basin shall be provided. On-site drainage shall be <br /> included in the grading vlan and shall also be noticed by a statement on the Final Map. <br /> (Development Title Section 9-1135.4b) <br /> 140 <br /> 6. A drainage study shall be corActed to determine the source of flooding along the frontage of <br /> Hewitt Road and how it isM be alleviated. The study shall also show that the natural sheet <br /> flow will not be blocked and continue as it did prior to development. Hydrological and hydraulic <br /> analyses shall demonstrate that all property, both down stream and upstream of the dischar e <br /> will not be sub'ect to a higher flood level as a result of the drainage. <br /> 7. 6-. Street lighting shall be provided at the Hewitt Road 1 Navarro Court intersection and the cul-de- <br /> sac. I <br /> (Development Title Section 9-1150.11) <br /> 8. 9-. The property shall annex to County Service Area No. 49 prior to the approval of the Final Map <br /> for the operation, maintenance and improvement of street lighting facilities. <br /> (Development Title Section 9-1100.5) <br /> 9. 44. A Preliminary Soils Report is required in accordance with the County Standards for the purpose <br /> of determining the R-Value for the design of the roads. <br /> (Development Title Section 9-910.2) <br /> 10. 44 All utilities shall be underground except power transmission facilities of 35 KV or greater. P}ublic <br /> utility easements shall be provided along the road frontage of the subdivision and as required <br /> by the public utility companies. <br /> (Development Title Section 9-1155.2) <br /> 111.. 4§ A grading plan shall be submitted and approved prior to approval of the Final Map. The grading <br /> plan shall contain the information listed in the U.B.C., Appendix, Chapter 33, Section 3309, <br /> complete drainage details and elevations of adjacent parcels. Retaining wall details shall be <br /> submitted where applicable. Grading in excess of 5,000 cubic yards shall comply with Sections <br /> ' 3309.3 and 3309.4 for"Engineered Grading Requirements." (Grading that disturbs more than <br /> i five acres will require a National Pollutant Discharge Elimination System permit.) <br /> E <br /> 12. 1-6 The subdivider shall agree to and shall pay user fees for the utility services from the time <br /> k improvements are accepted by the County until the lots are placed on the County tax rolls, <br /> or up to an eighteen-month period, as the case may be. <br /> (Subdivision Map Act Section 66493) <br /> 1 <br /> t <br />