Laserfiche WebLink
1 <br /> 1 <br /> AMENDED a, APPLICATION- MAJOR SUBDIVISION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NO.: SU- <br /> PROPOSED PARCELS <br /> Average Parcel Size Smallest Parcel Size Largest Parcel Size Average Parcel Frontage Smallest Parcel Frontage <br /> at setback) (at setback <br /> 2 Acres 2 Acres 2 Acres 250 ' 220 ' <br /> Water <br /> Service Provider Annex-Formatlon Distance to Public <br /> Public Water o Required Water Fee <br /> Private Waterx Existing Well o NowWeli' Well Replacement o <br /> Sewage Disposal <br /> Public Sewage Disposal o Service Provider Annex-Formation Distance to Public <br /> �4 <br /> Required Sewer Facility <br /> t <br /> On-site Sewage Disposal Existing Septic System o New Septic System o Other oX <br /> Storm Dratna e <br /> Public Storm Drainage o Service Provider Annex-Formation Terminal Drainage Detention-Retention <br /> Required to: Ponds <br /> Private Storm Drainage OX On-site Retention Pond(s) o Natural Draina e/Na Change OX Other o <br /> Electrici!X Natural Gas <br /> Service Provider Distance to Service Service Provider Distance to Service <br /> PG & E On site <br /> Telephone Service Cable Television Service <br /> Service Provider Distance to Service. Service Provider Distance to Service <br /> GTE On Site <br /> School Service Fire Protection Service <br /> Service Provider Distance to Elem Service Provider Distance to Fire <br /> i <br /> School Station <br /> Linden Unified 6 miles Linden-Peters Fire Dis 5 mi. <br /> Existing Roads <br /> Road/Street Name R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> N/A Yes o No o Yes o No o <br /> Yes o No o Yes o No o <br /> Proposed Roads By Width <br /> 50'R.O.W.Name: Navarro Court <br /> 60'R.O.W.Name: <br /> 84'R.O.W.Name: <br /> Others <br /> z <br /> Estimated Vehicle Trips Per Day at Buildout: Auto Truck: <br /> p <br /> 4A 9 <br /> r.w <br />