My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
8111
>
3500 - Local Oversight Program
>
PR0544804
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/4/2019 1:31:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544804
PE
3528
FACILITY_ID
FA0003850
FACILITY_NAME
M&M BUILDERS SUPPLY INC
STREET_NUMBER
8111
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95304
APN
25014006
CURRENT_STATUS
02
SITE_LOCATION
8111 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r V <br /> ( , <br /> V y U <br /> I! <br /> Ir 09/19/00 Second directive sent by SJC/EHD to submit a work plan to continue <br /> the site investigation. New deadline is October 20, 2000. <br /> r �I <br /> 10/03/00 SJC/EHD received this date the "Proposal for Additional Site <br /> Assessment Investigation" that was dated September 12, 2000. <br /> t �} <br /> 10/10/00 SJC/EHD did not approve the proposal because it was not adequate <br /> 9 to continue the investigation and it did not propose well installations. <br /> k Directive to submit an appropriate work plan by October 25, 2000. <br /> r' ;r <br /> 10/30/00 SJC/EHD received this date a work plan proposal dated <br /> ` October 16, 2000. <br /> i 4f11/03/00 October 16, 2000 work plan proposal conditionally approved by <br /> SJC/EHD. <br /> 11/30/00 Letter of Commitment issued this date by the State Water Resources <br /> Control Board. !'p <br /> ;I <br /> I <br /> 05/14/01 SJC/EHD correspondence to responsible party, directive to implement <br /> 1 the conditionally approved October 16, 2000 work plan. <br /> ,i <br /> 07/23/09- Continuation of site investigation with a series of geoprobe soil borings. <br /> 07/24/01 <br /> L 08/29/01 Three shallow groundwater monitoring wells installed this date. <br /> 11/07/01 Site Investigation and Quarterly Groundwater Monitoring report sub- <br /> mitted to SJC/EHD this date. Only groundwater contamination noted <br /> was TPH as diesel in source area well. 1 <br /> I <br /> 12/20/02 Quarterly monitoring report dated December 4, 2002 received by <br /> SJC/EHD. After five quarters on monitoring the only detections of <br /> contamination have been TPH as diesel in the source area well. <br /> On-site domestic production wells have been non-detect. <br /> 02/17/05 Quarterly Monitoring Report and Request for Site Closure dated <br /> February 10, 2005 received by SJC/EHD; Calculation of contaminant <br /> mass remaining in groundwater reported;to be 0.004 gallons TPH as <br /> diesel and 0.00058 gallons TPH as gasoline. <br /> I <br /> n <br /> �i <br /> Ii <br /> 2 <br /> ;i <br />
The URL can be used to link to this page
Your browser does not support the video tag.