Laserfiche WebLink
N MW-1 I <br /> AD 36.8 <br /> AD 37.0 i <br /> 11Dj 3 7.2 I <br /> trees <br /> ! WREh <br /> AD i I a <br /> ♦ ♦ ♦j 37.4 <br /> a. <br /> ♦ xl <br /> ♦ ♦ ♦i ♦ a MW-2 I <br /> 36.8 ♦ ♦ j AD �! <br /> I ♦ ♦ AD �I <br /> j ♦ ♦ ♦ ♦ ♦ AD <br /> j 37.0 �♦ �♦ AD I <br /> i <br /> I <br /> I 37.2 ♦ ♦ ! <br /> ! Storage ;,+ Storage 3 7.6 ! <br /> I <br /> Shed 3 7.4, Sheri i <br /> Aggregate <br /> I ♦ i <br /> Water <br /> Plant Well <br /> B-10 B-3 I I <br /> I 8 <br /> IIleI <br /> I � I <br /> ! ♦ 1 <br /> I ♦ I <br /> 3 7.6 i;y., B-2 I <br /> i garage office MW-3 <br /> i �+ ,B-5 <br /> nD i <br /> I <br /> 13-1 1+� 440 <br /> I <br /> I `.1 AD I <br /> I AD I <br /> .._._._._._.J I <br /> I <br /> B-8 I <br /> I <br /> �Y <br /> canal <br /> West Eleventh Street <br /> B-1 <br /> Previous Exploratory Boring Location, <br /> March, 2000 <br /> B_e 0 30 <br /> Exploratory Boring Location and Number, feet <br /> drilled July 24, 2001 <br /> MW-1 [3 Monitoring Well Location, groundwater <br /> ND, TPHG well sample results, Sept. 12, 2001 Groundwater Monitoring <br /> ND, TPHD Well Sample Data, <br /> ID, Benzene Sept. 12, 2001 Project No. 4669 <br /> 1--,VD, MTBE Scale: 1" = 30' <br /> M&M Builders Date: Nov., 2001 <br /> Wright Environmental Services, Inc 8111 W. 11th Street <br /> Tracyr3 <br /> Tracy, CA , CA Figure <br />