My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010866
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
8181
>
3500 - Local Oversight Program
>
PR0544805
>
ARCHIVED REPORTS XR0010866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:07 AM
Creation date
9/4/2019 2:10:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010866
RECORD_ID
PR0544805
PE
3528
FACILITY_ID
FA0005204
FACILITY_NAME
GENSTAR WESTERNSTONE PRODUCTS
STREET_NUMBER
8181
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014005
CURRENT_STATUS
02
SITE_LOCATION
8181 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F r- <br /> HEALTH AND SAFETY PLAN <br /> Western Stone Products Facility <br /> 8181 W. 11th Street <br /> Tracy, CA <br /> INTRODUCTION <br /> PURPOSE AND SCOPE <br /> This Health and Safety Plan provides for the protection of on-site personnel and the surrounding <br /> community during site characterization activities. The requirements, specifications and <br /> procedures presented with this plan will apply to all personnel on-site including employees, sub- <br /> contractors, site visitors and regulatory agency personnel. <br /> KEY PERSONNEL <br /> The site's Safety Coordinator/Project Manager will provide training to site personnel in the use <br /> of safety and personal protection equipment and will manage the on-site monitoring program. <br /> The Safety Coordinator/Project Manager will have the authority to deny access to any individual <br /> without the proper training or protective equipment required for the site conditions or those <br /> individuals disregarding site safety procedures. All site personnel will be under the direction <br /> of the Safety Coordinator/Project Manager. <br /> HAZARD ANALYSIS <br /> The property formerly operated a diesel and gasoline fuel distribution facility. Laboratory <br /> results of soil samples collected near the former diesel tank indicates the presence of diesel fuel <br /> contamination. <br /> The activities addressed by this safety plan include drilling and subsurface soil and groundwater <br /> sample collection. Although exposure at hazardous levels are unlikely, these activities present <br /> the potential for exposure to toxic materials through both skin contact and inhalation. The <br /> SAFFITY MP <br />
The URL can be used to link to this page
Your browser does not support the video tag.