Laserfiche WebLink
Addendum-Soil Suitability&Nitrate Loading Study Page 2 <br /> Proposed Stama Winery, 17521 Davis Rd,Lodi CA <br /> Project No. 670.1B <br /> November 6,2013 <br /> Personnel No.Persons Flow Rate Schedule Annual Output <br /> Caretaker Residence 5 60 GPD per Person 355 DaysfYr 106,500 gals <br /> Full Time Employees 4 15 GPD per Person 260 Days/Yr 15,600 gals <br /> Part Time Em to es• 5 8 GPD per Person 260 Days/Yr 10,400 gals <br /> Tasting Room Visitors** 71 71 X 4 GPD 355 DaysfYr 100,820 gals <br /> Marketing Meetings*** 150 8 GPD per Person 30 DaysfYr 36,000 gals <br /> Comms Kitchen 150 3 GPD per Person 8 DaysfYr 3.600 gaJs <br /> Total Annual Effluent, 272,920 gab <br /> • Assumes part timers work approx.half time. <br /> •• Assumes 500 visitors per 7-day week. <br /> Assumes 4 restroom visits each day per person at 2 gals.per use. <br /> 7.2 Nitrate Loading Calculation <br /> An estimate is made of total nitrate load as calculated from a simple mass-balance approach. <br /> The Hantzsche and Finnemore model is then used to estimate the nitrate concentration in <br /> groundwater. The calculation worksheet(s) are attached. <br /> The following table summarizes the revised flow-rate calculation with nitrate effluent loads for <br /> the anticipated septic system. <br /> Use Annual Ave. Effluent Vol.Weighted <br /> Effluent Daily Flow Cone. N„ Ave. <br /> Caretaker Residence 106.500 gals 292 GPD 44 m 17.2 mgfL <br /> Full Time Employees 15,600 gals 43 GPD 80 mgfL 4.6 m <br /> Part Time Employees 10,400 gals 28 GPD 80 m 3.0 m <br /> Tasting Room 100,820 gals 276 GPD 80 m 29.5 m <br /> Marketing Meetings 36,000 gals 99 GPD 80 m 10.6 mgfL <br /> Comm?Kitchen 3,600 10 60 m L 0.8 m <br /> TOTALS 272,920 gals 748 GPD 65.7 m <br /> The total load will be 748 GPD at 65.7 mg/L nitrate concentration. The Hantzsche and <br /> Finnemore model is then used to estimate the nitrate concentration in groundwater. The <br /> calculation worksheet(s)are attached. <br /> System Acres Daily Flow Effluent Denitrification Percolation N Loading <br /> Cone. . Factor d R <br /> Proposed 1 10 748 GPD 1 65.7 mgfL 25% 7.85 in. 112 IN <br /> The proposed septic system will produce a load of 112 pounds per year of nitrogen loading. <br /> This represents an average concentration at the groundwater surface 6.48 mg/L of nitrogen, <br /> or 65 percent of the established maximum contaminant limit of 10 mg/L. The future system is <br /> estimated to result in nitrate loading to groundwater that will not exceed the MCL limit. This <br /> calculation does not consider the dilution that occurs as newly introduced water mixes with <br /> the deeper groundwater. The calculated groundwater concentrations offers a "worst case" <br /> 2937 Venemen Ave.,#8240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto,CA 95356 Fax: (209)569-0295 <br />