Laserfiche WebLink
�aPqurN ca ------ <br /> ~z y COUNTY Off' SAKI JOAQU I N . <br /> EUGENE OELUCCHI <br /> DEPARTMENT OF PUBLIC WORKS C IEFDEPUTYDIRECTOR <br /> •:. _ _ F.0.8OX 1810-- 1810 E.HAZELTON AVENUE THOMAS R.FLINN <br /> - STOCKTON,CALtFCRNIA 95201 OEPUTY DIRECTOR <br /> L r P (2091468.3000F O R <br /> FAX(209)458.2999 DEPUTY DIRECTOR <br /> MANUEL Z <br /> HENRY M. HIRATA RICHARD C.PAYNE <br /> DIRECTOR DEPUTY DIRECTOR <br /> August 19, 1992 , <br /> M E M O R A N D U M <br /> i TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Steven St. Sure <br /> FROM: Charles Kelley, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: UP-92-24 PRE-APPLICATION for a (family) Winery. Located <br /> on the W. side 'of DeVries Rd. , S. of Turner Rd. , W. of Lodi. <br /> APPLICANT: Charles & Bettyann Spenker APN: 025-150-10 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area, <br /> i <br /> DeVries Road has an existing right-of-way width of 80 feet, and a ' <br /> planned right-of-way width of 84 feet. <br /> RECOMMENDATIONS: <br /> 1. Any driveway that exceeds 150 feet in length from any public <br /> roadway shall be improved in accordance with the requirements <br /> of the Uniform Fare Code Section 10.207, San Joaquin County <br /> Standards F-1a, F-1b, F--lc & R-17 and the Woodbridge Rural <br /> Fire District- prior to issuance of the building permit. <br /> (San Joaquin County Ordinance No. 3622) <br /> 2 . Encroachment permit shall be required for work within road <br /> right-of-way. (Streets and Highway Title Section 10-3103) <br /> 3 . The Traffic Impact Mitigation Fee will be. re <br /> p g quired for this <br /> development. The fee is due and payable at the time of <br /> building permit application. (The fee currently is $1, 148 . 00 <br /> per 1, 000 gross square foot of building as "Manufacturing" in <br /> the Lodi area. If there is no building permit- required, the <br /> fee will be exempt. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025) <br /> { c: Manuel. Lopez <br /> Deputy' Director/Development <br /> � 1 <br /> r' <br />