Laserfiche WebLink
o�qufry c <br /> G COUNTY OF SAN JOAQU I N EUGENE DEL.UCCHI <br /> CNI£F DEPUTY DIRECTOR <br /> y Z� DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1610 E.HAZELTON AVENUE THOMAS R.FLINN <br /> •• t• DEPUTY DIRECTOR <br /> STOCKTON,CALIFORNIA 95201 <br /> .300 ofOEOPZ <br /> (2091468UV IRO <br /> HENRY M. HIRATA ` lIRfp IRR <br /> j <br /> DIRECTOR '3 "1 <br /> June 17, 1992 : �,�' #V <br /> ;'- <br /> 81992 <br /> M—E M—O—R AWN_D U—M :{?i�] ,, <br /> TO: Thomas M. Gau, Senior Civil Engineer j,�f� "l1 <br /> Community Development Department <br /> CONTACT PERSON: Chandler T. Martin <br /> FROM: Charles Kelley, Senior Civil Enginee <br /> ct6/ <br /> Public Services Division <br /> SUBJECT: MS-92-119 divide a . 323 acre parcel into two parcels. <br /> of. 158-acre and . 166-acre. Located on the W. side of Del Mar Ave. , <br /> N. of E. Main St. , Stockton. <br /> APPLICANT: E. & J. Vasti APN: 159-090-19 <br /> INFORMATION: <br /> The site is not located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> Del Mar Avenue has an existing right-of-way width of 40 feet, and <br /> a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Planning Title Section 9-9112) <br /> 2 . The Traffic Impact Mitigation Fee will be required when <br /> parcels are developed. The fee is due and payable at the <br /> time of building permit application. (The fee currently is <br /> $2, 813 . 00 per single family dwelling unit in the Stockton area. <br /> The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) (Resolution R-90-304 , R-91-1025) <br /> 3 . The Water Supply Facilities Impact Mitigation Fee will be <br /> required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. (The fee <br /> currently is $1, 069 . 00 per single family dwelling unit . If <br /> there is no building permit required, the fee will be exempt. <br /> The fee shall be automatically increased on January i of each <br /> year at the rate of 6. 9 percent. An additional 3 . 5 percent <br /> shall be added to the fee upon payment for processing and <br /> administering the program. (Resolution R-91-327) <br /> 1 <br />