Laserfiche WebLink
PquiH <br /> THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> ` STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR (209)468-3000 FAX(269)468-2999 <br /> •r4tiFOPaP. www.sjgov.org/putrworks <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR <br /> MICHAEL SELLING Worldn for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER RECIEVED <br /> DEPUTY DIRECTOR <br /> ROGER JANES FEB 1 6 2010 <br /> BUSINESS ADMINISTRATOR <br /> Community Development❑epi.' <br /> February 12,2010 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Corinne <br /> King <br /> FROM: Bill DuBois, Engineer III �U <br /> Public Services Division <br /> SUBJECT: PA-1000013;A Use Permit application to establish a 640 square foot cheese manufacturing facility on <br /> an existing dairy; located on the south side of Dodds Road, at the intersection of Mariposa Road and <br /> Dodds Road,Escalon. (Supervisorial District 4) <br /> PROPERTY OWNER: Rick A. &Ansally Joanna Stuyt Trust APPLICANT: Same <br /> ADDRESS: 21812 E. Dodds Road,Escalon APN: 205-210-10 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Dodds Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> Mariposa Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 110 feet. <br /> RECOMMENDATIONS: <br /> 1. The site shall be designed to contain the storm water runoff on site and to prevent offsite sediment transport. <br /> Provide drainage facilities and meet the requirements of San Joaquin County Development Standards to <br /> prevent the increased runoff release rate of storm water from discharging onto other properties. Retention <br /> basins shall be fenced with six(6)foot high chain link fence or equal when the maximum design depth is 18 <br /> inches or more. Required retention basin capacity shall be calculated by a registered civil engineer, licensed <br /> contractor or licensed architect prior to release of Building Permit. (Development Title Section 9-1135) <br /> 2. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. The fee will be based on the current schedule at the <br /> time of payment. The fee shall be automatically increased on January 1 of each year through the year 2015 <br /> at the rate of 4.55 percent. A credit may be allowed if it can be verified that the existing development on <br /> this site was in operation on or after April 30, 1991.)(Development Title Section 9-818.4 and Resolutions <br /> R-91-327, R-94-185 and R-97-5) <br />