Laserfiche WebLink
t <br /> d <br /> SOIL SUfTABILITY STUDY <br /> : FOR THE <br /> JOE� DnS'LVA PROPERTY(JOE DaSILVA D �• :��`�"; �_ ,. _, <;�' ,=- ; <br /> DAIRY BUILDINGS EXPANSION PROJECT <br /> 2739$EAST DODDS ROAD,ESCALON CALIFORNIA 95320 11200� <br /> ENVIF.^P,M7 TFS',_ i'cALTH <br /> April 11, 2000 PERMIT/SERVICES <br /> Prepared By 1% <br /> E. <br /> E, �Gq� <br /> a� <br /> is Walter E. Curtis i� 115$4 �N , <br /> Civil Engineer m <br /> C.E. # 11584 r�a <br /> 418 Matthew Plaza '� of CALIV <br /> Lodi, California 95240 <br /> Phone: (209)368-4159 <br /> PROJECT DESCRIPTION: Expansion of the Joe DaSilva Dairy Buildings and Facilities <br /> on the Joe DaSilva property located at 27398 East Dodds Road Escalon California <br /> 95320. ' <br /> i <br /> TEST RESULTS: <br /> Dai Ex ansion DeeDTest_ Percolation Rate Minimum Usable <br /> Parcel Hole No. Mnutes Per Inch) <br /> } Area <br /> (.5 uare Feet <br /> Yes DP 30 12,000 +Pits <br /> Or Sump ` <br /> a � <br /> !� SOIL PROFILE: No water was encountered in excavating the Percolation Test Hole used <br /> as the Soil Profile Test Hole to a maximum depth of 10.50 feet. See the attached"Field F <br /> , Percolation Data Sheet" and`Building Plan"as well as the text of this report for the # <br /> �I specific soil layer and character and test hole location details. <br /> d <br /> WELL WATER ANALYSIS: No well water testing for Dibromochloropropane(DBCP) <br /> or Nitrates(NO3)was performed as an integral part of this study and report. The property <br /> Po p PertY <br /> owner is making his own arrangements for any needed well water testing and will <br /> provide the results of his testing in a separate report. <br /> RECOMMENDATIONS: A 12,000 square feet minimum usable disposal area in <br /> conjunction with Pits is recommended for this dairy buildings and facilities expansion F <br /> j project, Because of the depth of the good draining soil existing at 10.50 feet, a sump <br /> i installation would be an acceptable alternate. <br /> ' Also at the time of construction if the sewage facility is to be established at the <br /> same location as the deep percolation test hole(DP)site,the area will have to be filled-in ' <br /> and water not allowed to drain through as in the past. <br /> E <br />