Laserfiche WebLink
c <br /> Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-99-19 <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is <br /> due and payable at the time of building permit application. (The fee currently is <br /> $555 per 1,000 gross square foot of building as Manufacturing in the Escalon <br /> area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News <br /> Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable prior to issuance of the building <br /> permit. The fee currently is $159 per 1,000 gross square foot of building as <br /> Manufacturing. The fee shall be automatically increased on January 1 of each <br /> year through the year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and <br /> R-97-5) <br /> 5. A copy of the Final Site.Plan shall be submitted prior to release of building permit. <br /> i <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. <br /> GK:RWH:gn <br /> PS-8C164.GiD <br /> E: Manuel Lopez, Deputy Director/Development <br />