Laserfiche WebLink
• TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY ................................................................................. 1 <br /> Introduction................................................................................................................. 1 <br /> Proposed Development.............................................................................................. 1 <br /> SiteDescription........................................................................................................... 1 <br /> PastUses of the Site .................................................................................................. 2 <br /> Existing and Proposed Septic Tank Usage.............................................................. 2 <br /> ExistingSeptic System.............................................................................................. 2 <br /> ProposedSeptic System........................................................................................... 2 <br /> On-Site Septic Permit History ................................................................................... 2 <br /> Existing Septic Tank Usage in the Vicinity................................................................ 2 <br /> Septic Permit History in the Vicinity .......................................................................... 2 <br /> Expected On-Site Maximum Septic Tank Usage...................................................... 3 <br /> Ground Water Information .........................................................................................3 <br /> Depthand Gradient................................................................................................... 3 <br /> Potential Ground Water Contamination Issues......................................................... 3 <br /> • On-Site Wells............................................................................................................ 3 <br /> WaterSample ...........................................................................................................4 <br /> Soil Profile and Geologic Information....................................................................... 5 <br /> SoilBorings............................................................................................................... 5 <br /> Discussion of Soil Lithology ...................................................................................... 5 <br /> PercolationTest.......................................................................................................... 6 <br /> Preparation and Presaturation of Percolation Test Holes......................................... 6 <br /> PercolationTest Procedure....................................................................................... 6 <br /> PercolationTest Results........................................................................................... 6 <br /> Discussion of Percolation Test Results..................................................................... 7 <br /> Discussion of Septic System Sizing.......................................................................... 7 <br /> CONCLUSIONS AND RECOMMENDATIONS.................................................... 8 <br /> LIMITATIONS....................................................................................................... 9 <br /> SELECTED REFERENCES ............................................................................... 10 <br /> • <br /> LOGE 1721 <br />