Laserfiche WebLink
i F <br /> I Phase I Site Reconnaissance Checklist <br /> 1"1 NOA Project Number: E05163A <br /> l Page 4 <br /> 17. a. Is there evidence that the subject property discharges waste water, other than storm <br /> water, directly into a ditch or stream adjacent the property? <br /> Yes ❑ No <br /> b. Any discharges observed within 200 feet? <br /> Yes ❑ None observed ❑✓ <br /> 3 18. a. Is there evidence of underground/ above ground storage tanks on the subject <br /> property, including vent pipes, fill pipes, or access ways indicating a fill pipe protruding <br /> from the ground on the subject property? <br /> Yes 0 No ❑ <br /> b. Within 200 feet? <br /> Yes❑ None observed WJ <br /> t;. <br /> 19. Describe the subject property and its physical, topographic, and vegetative features. <br /> Rectangular,flat orchard. <br /> w 20. a. For each structure on the subject property, describe its uses and the location and <br /> J P P Y> <br /> type of heating and cooling system. <br /> No structures on property <br /> b. Are any structures on the subject property observed to contain readily apparent <br /> asbestos-containing materials (ACM)? <br /> Yes ❑ No ❑✓ <br /> c. Are there any floors, drains, or walls located within the structure which have been <br /> I stained with a substance other that water or are emitting foul odors? <br /> Yes ❑ No ✓❑ <br /> Continuations from above: <br /> 1 <br /> 4 Site Reconnaissance conducted on: January 12, 2006 <br /> By: James Robinson&Tina Cheney <br /> 5 <br /> � F <br /> �i <br />