Laserfiche WebLink
DEPARTMENT OF THE ARMY <br /> U.S.ARMY ENGINEER DISTRICT,SACRAMENTO <br /> CORPS OF ENGINEERS <br /> 1325 J STREET <br /> SACRAMENTO CA 95814-2922 <br /> REPLY TO <br /> ATTENTION OF <br /> December 15, 2014 <br /> Regulatory Division SPK-2014-01139 <br /> Megan Aguirre <br /> San Joaquin County Community Development Department <br /> Development Services Division <br /> 1810 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Dear Ms. Aguirre: <br /> We are responding to your November 26, 2014 request for comments on the Prouty <br /> Road Subdivision Parcel Divide & Map Waiver project. The San Joaquin County <br /> Community Development Department project identification number is PA-1400209 <br /> (MS). The project is located in Section 30, Township 5 N, Range 8 E, Mount Diablo <br /> Meridian, Latitude 38.26082069999980, Longitude -121.135431645568°, Galt, San <br /> Joaquin County, California. <br /> The Corps of Engineers'jurisdiction within the study area is under the authority of <br /> Section 404 of the Clean Water Act for the discharge of dredged or fill material into <br /> waters of the United States., Waters of the United States include, but are not limited to, <br /> rivers, perennial or intermittent streams, lakes, ponds, wetlands, vernal pools, marshes, <br /> wet meadows, and seeps. Project features that result in the discharge of dredged or fill <br /> material into waters of the United States, including Dry Creek, which is a potential <br /> jurisdictional water of the United States, will require Department of the Army <br /> authorization prior to starting work. <br /> To ascertain the extent of waters on the project site, Monte K. Seibel should prepare <br /> a wetland delineation/in accordance with the "Minimum Standards for Acceptance of <br /> Preliminary Wetlands Delineations" and "Final Map and Drawing Standards for the <br /> South Pacific Division Regulatory Program" under "Jurisdiction" on our website at the <br /> address below, and submit it to this office for verification. A list of consultants that <br /> prepare wetland delineations and permit application documents is also available on our <br /> website at the same location. <br /> The range of alternatives considered for this project should include alternatives that <br /> avoid impacts to wetlands or other waters of the United States. Every effort should be <br /> made to avoid project features which require the discharge of dredged or fill material <br /> into waters of the United States. In the event it can be clearly demonstrated there are <br />