Laserfiche WebLink
U.S.Department of Homeland Security <br /> FEMA Region IX <br /> 1111 Broadway,Suite 1200 <br /> OaM—d,CA.94607-4052, <br /> U <br /> FEMA <br /> June 12, 2018 <br /> Frank Girardi,Project Manager <br /> San Joaquin County, Community Development Department <br /> Development Services Division <br /> 181 O East Hazelton Avenue <br /> Stockton, California 95205 <br /> Dear Mr_ Girardi: <br /> This is in response to your request for comments regarding Application Referral Application <br /> Number PA 1800128 (MS),Minor Subdivision application(APN/Address: 355-270-07/207 East <br /> Durham Ferry Road) (Supervisorial District 5). <br /> Please review the current effective countywide Flood Insurance Rate Maps (FIRMs) for the <br /> County of San Joaquin(Community Number 060299), Maps revised October 20,2016_ Please <br /> note that San Joaquin County, California is a participant in the National Flood Insurance <br /> Program(1,1171P). The minimum,basic NFIP floodplain management building requirements are <br /> described in Vol. 44 Code of Federal Regulations (44 CFR), Sections 59 through 65. <br /> A summary of these NFIP floodplain management building requirements are as follows: <br /> • All buildings constructed within a riverine floodplain, (i.e.,Flood Zones A,AO,AH, AE, <br /> and Al through A30 as delineated on the FIRM),must be elevated so that the lowest <br /> floor is at or above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rate Map_ <br /> • If the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM,any development must not increase base flood elevation levels. The term <br /> development means any man-made change to improved or unimproved real estate, <br /> including but not limited to buildings, other structures, mining, dredging,filling, <br /> grading,paving, excavation or drilling operations, and storage of equipment or- <br /> materials. <br /> rmaterials. A hydrologic and hydraulic analysis must be performed prior to the start of <br /> development, and must demonstrate that the development would not cause any rise in <br /> base flood levels. No rise is permitted within regulatory floodways. <br /> www.femagov <br />