My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011811 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DURHAM FERRY
>
207
>
2600 - Land Use Program
>
PA-1800128
>
SU0011811 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:28 AM
Creation date
9/4/2019 5:39:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0011811
PE
2622
FACILITY_NAME
PA-1800128
STREET_NUMBER
207
Direction
E
STREET_NAME
DURHAM FERRY
STREET_TYPE
RD
City
TRACY
Zip
95304-
APN
25527007
ENTERED_DATE
6/5/2018 12:00:00 AM
SITE_LOCATION
207 E DURHAM FERRY RD
RECEIVED_DATE
6/4/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DURHAM FERRY\207\PA-1800128\SU0011811\SS STUDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY ................................................................................. 1 <br /> Introduction................................................................................................................. 1 <br /> ProposedDevelopment.............................................................................................. 1 <br /> SiteDescription........................................................................................................... 1 <br /> PastUses of the Site .................................................................................................. 2 <br /> Existing and Proposed Septic Tank Usage..............................................................2 <br /> ExistingSeptic System.............................................................................................. 2 <br /> ProposedSeptic System........................................................................................... 2 <br /> On-Site Septic Permit History ................................................................................... 2 <br /> Existing Septic Tank Usage in the Vicinity................................................................2 <br /> Septic Permit History in the Vicinity .......................................................................... 2 <br /> Expected On-Site Maximum Septic Tank Usage...................................................... 3 <br /> Ground Water Information .........................................................................................3 <br /> Depthand Gradient................................................................................................... 3 <br /> Potential Ground Water Contamination Issues......................................................... 3 <br /> • On-Site Wells............................................................................................................ 3 <br /> WaterSample ...........................................................................................................4 <br /> Soil Profile and Geologic Information....................................................................... 5 <br /> SoilBorings............................................................................................................... 5 <br /> Discussionof Soil Lithology ...................................................................................... 6 <br /> PercolationTest..........................................................................................................6 <br /> Preparation and Presaturation of Percolation Test Holes.........................................6 <br /> Percolation Test Procedure.......................................................................................6 <br /> Percolation Test Results........................................................................................... 7 <br /> Discussion of Percolation Test Results..................................................................... 9 <br /> Discussion of Septic System Sizing.......................................................................... 9 <br /> CONCLUSIONS AND RECOMMENDATIONS.................................................. 10 <br /> LIMITATIONS..................................................................................................... 11 <br /> SELECTED REFERENCES ............................................................................... 12 <br /> • <br /> LOGE 1811 <br />
The URL can be used to link to this page
Your browser does not support the video tag.