My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002749
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
5565
>
2600 - Land Use Program
>
SA-98-67
>
SU0002749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2019 8:59:40 AM
Creation date
9/4/2019 5:58:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002749
PE
2633
FACILITY_NAME
SA-98-67
STREET_NUMBER
5565
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
ENTERED_DATE
11/1/2001 12:00:00 AM
SITE_LOCATION
5565 S EL DORADO ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\5565\SA-98-67\SU0002749\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y' <br /> Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-98-67 <br /> i <br /> 3. All building set-backs shall respect the tentative right-of-way line of Arch-Airport/Sperry Roads. <br /> (Development Title Table 9-410.3) <br /> 4. The alignment and geometrics for tentative Arch-Airport/Sperry Roads shall be shown on the Final <br /> Site Plan. <br /> (Development Title Section 9-1150.2) i <br /> 5. The owners shall prepare and record a"Notice"by separate instrument with the San Joaquin <br /> County Recorder that states the existing driveway and water well and proposed sign shall be <br /> relocated when Arch-Airport/Sperry Roads is constructed. <br /> 6. The Traffic impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $160.04 per additional , <br /> daily trip-end generated in the Stockton area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost index as published by the Engineering News Record.) <br /> A credit may be allowed for the previous use if it can be verified that it was in operation since <br /> April 23, 1990. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 7. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> G K.RH:gn <br /> PS-W03I,Qi D <br /> E: Manuel Lopez, Deputy Director/Development <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.