Laserfiche WebLink
- <br /> Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-04-5.35 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and.payable at <br /> the time of building permit application. (The fee currently is $198.98 per additional daily trip-end <br /> generated in the.Stockton area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Cohstruction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00.433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> I Note: Any.construction activity that results in the disturbance of at least one(1) acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> PACOMMENMSAWR 20041PA-0400535.wpd . <br /> I <br />