Laserfiche WebLink
HAGAXDUU�) MAIEKIALS MANAULMhN I PLAN Page 2 of J <br /> 3 <br /> METHOD OF EMPLOYEE NOTIFICATION (8) <br /> (e.g. siren, public address system, verbal VERBAL <br /> orders, etc.)} EVACUATION ASSEMBLY AREA(S) (9) WEST OF SHOP AT PROPERTY ENTRANCE <br /> (Where employees are to report to) <br /> LOCATION OF HMMP FOR EMPLOYEE USE <br /> (10) AT EMPLOYEE DESK <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br /> The following types of neighbors (e.g. residential, commercial, open space)are located within 118th mile of our fac <br /> _. Names of hospitals, schools, and day-care centers within 118th mile of our facility are also shown. This informatior <br /> should be provided to the 9-1-1 operator at the time of the initial notification. <br /> NORTH OWNER'S RESIDENCE EAST OPEN PASTURE <br /> SOUTH OPEN PASTURE WEST OPEN RICE FIELD <br /> li <br /> SPILL CONTROL PROCEDURES SECTION <br /> r The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facilil <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> SPILL CONTROL LEADER (12) PETE VANDER MEULEN <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> J <br /> HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br /> PHIL VANDER MEULEN, STEVE VANDER MEULEN, BRETT MILLER„ CHRIS, WALTHER <br /> jAUTHORIZED SPILL CONTROL STRATEGIES (14) <br /> This business has authorized the above personnel to perform the action(s) indicated below to control spills of <br /> hazardous materials on its property. Persons performing these tasks will possess written procedures for performin <br /> hem and will have received training on the procedures and equipment needed prior to carrying them out. Locatior <br /> J needed equipment are shown on the facility map. At a minimum our business must isolate the area of the spill anc <br /> I make notifications. <br /> 1 <br /> l SPILLS OF LIQUID MATERIALS <br /> Plug and Patch Container Build Retention Dike <br /> Remove Sources of Ignition V Position Container so as to Stop Leak <br /> Reduce Pressure in Container/System Isolate Area and Make Notifications <br /> Neutralize Spilled Material Secure System Valves and Closures <br /> Shutdown System Involved Ali Apply Absorbent Material to Spill Area <br /> RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> D Shut Off Valves/Systems Cover Spill to Prevent Spread <br /> L Ventilate Area of Release Neutralize Spilled Materials <br /> i <br /> Ir <br /> http://sjoesdata.org/gp_HMMP detail.lasso?-Database=transaction-�Plan+Filc&-Table=cd... 612112007 <br />