Laserfiche WebLink
Housing Density&Product Diversity. The project will achieve a density of 13.7 units per acre,which <br /> is within the Master Plan density of 12-14 units per acre. <br /> Four floor plans will be offered: Plan 1 will contain 1,218 square feet, Plan 2 will contain 1,475 <br /> square feet, Plan 3 will contain 1, 623 square feet, and Plan 4 will contain 1,630 square feet. With <br /> the exception of Plan 1, all floor plans will feature 3 bedrooms,2Yz baths,and a 2-car garage. Plan 1 <br /> will feature 2 bedrooms,2%:baths, and a 1-car garage. <br /> Architecture and Landscaping. The project will utilize four architectural vernaculars:Traditional, <br /> Mission, Craftsman, and Half Timber. All landscape, hardscape and street elements within the <br /> project will be designed and constructed in accordance with the adopted Mountain House <br /> Community Services District(MHCSD) Design Manual and community approvals regarding specific <br /> themes and material variation. <br /> Residential Population Forecast. Using the same methodology as those used in the 1994 Master <br /> Plan Environmental Impact Report(EIR), the project is expected to generate a residential <br /> population of 606. <br /> Student Generation and Educational Services. Based on Master Plan school generation <br /> assumptions, the project is expected to generate 102 K-8 students and 13 high school students. <br /> Educational services will be provided by the Lammersville Elementary School District(LESD), for <br /> grades K-8, and by the Tracy Unified School District(TUSD), for grades 9-12.As condominium <br /> units are occupied in the project, K-8 students would attend either Wicklund School in <br /> Neighborhood F or Bethany School in Neighborhood E, prior to the construction of the K-8 school <br /> in Neighborhood G. The Master Plan states that a new high school I (Phase 1)will be constructed <br /> when there are approximately 650 high school students in Mountain House. Until such time that <br /> the new high school is constructed,students would attend West High School located about six <br /> miles from Neighborhood E. (TUSD has entered into an agreement with the Master Developer, <br /> Trimark Communities, LLC, to fund portable classrooms that will be placed at the West High <br /> School campus. This campus has adequate space to accommodate up to 30 portables.) <br /> Public Health and Safety Services. The proposed project will be located within one mile of the fire <br /> station that has been constructed at the southwest corner of Mascot Boulevard and Tradition <br /> Street, assuring a rapid response time for fire and paramedic services to the project site. A <br /> sheriffs substation for Mountain House is planned for the Town Center. However, until <br /> development of the Town Center occurs, it is anticipated that the sheriff would utilize an office in <br /> the fire station. <br /> Recreation and Open Space. In addition to creating residential lots for condominiums,the proposed <br /> subdivision will create private street lots, open space lots, and recreational areas that will be <br /> maintained by a Home Owners Association.Two principal recreational areas are also proposed:a <br /> recreation center consisting of a multi-purpose building (with an events room, kitchen, and <br /> bathrooms), outdoor pool, barbeque, and picnic tables(see Figure 4); and a tot lot area providing <br /> play equipment for 2-5 year-olds, picnic tables, barbeque, and informal lawn area(see Figure 5). <br /> Within close proximity to the project, condominium residents could also use the Neighborhood G <br /> Neighborhood Park,which will be developed adjacent to the planned Neighborhood G, K-8 school. <br /> Prior to the park's construction, residents of the project could use the 5-acre neighborhood park in <br /> Neighborhood F and the sports fields located at Wicklund School. <br /> 5 <br />