Laserfiche WebLink
k <br /> MOUNTAIN HOUSE MASTERPLAN AND SPECIFIC PLAN I <br /> SAN JOAQUIN COUNTY MITIGATION MONITORING PROGRAM <br /> Impact Mitigation Measure Monitoring Perron/ Fr ' ulen or <br /> of <br /> Pa Requirements Agency z e9 cy a <br /> Res onsible Monitorin <br /> fSome <br /> of the mitigation measures from the Final Environmental Impact Report have been Incorporated into the Master Plan,Master Plan Appendices,Specific Plan I,and Public Financing Plan. <br /> mitigation measures have been included as Amendments to the San Joaquin County General Plan and/or the Mountain House Development Title. Compliance with these mitigation <br /> reswill occur as a function of the Im IementatioERSUPPLY <br /> 1.1 a)If potential or proposed restrictions on diversion would cause the confirmed water Review of SJCDPW SP <br /> Inadequate raw water storage facilities may supply to be insufficlent to serve the project as proposed In the Master Plan,then Subsequent ' <br /> result in interruption of water service, the specific plans shall Identify additional water oonservation/reuse measures to be Specific Plans. <br /> especially if restrictions on water diversion Incorporated Into the project to ensure that the demand would not exceed the <br /> were Imposed by State or Federal agencies. confirmed supply. <br /> M4.4.15 a)Industrial reuse of water treatment sludge shall be practiced to the maximum Plan review. MHCSD,SJCDPW DP for water <br /> Water treatment sludge disposal could extent possible.The Community Service District shall consider other disposal treatment plant <br /> adversely Impact local water quality or options only If Industrial reuse were infeasible. <br /> unnecessarily occupy scarce landfill space. <br /> M4.4.15 a)Chemical Selection and Facilities.Prior to the plants,chemicals associated with Review MHCSD,SJCDPW DPs for water and <br /> An uncontrolled release of hazardous water and wastewater treatment operations shall be carefully selected to minimize Plan/Engineem waste•waler <br /> materials associated with water treatment the hazard.Chemical handling and storage fatalities shall be designed to minimize Report <br /> treatment plants <br /> practices could potentially occur and Impact and effectively mitigate the potential for accidental releases,Including such features <br /> water resources and public health. as secondary containment,alarms,remote sensing Instruments,and other safety <br /> features. <br /> WASTEWATER <br /> M4.4.2.1 a)Additional wastewater treatment processes shall be provided If unrestricted use Plan review. SJCDPW SP <br /> Inadequately treated reclaimed wastewater reclamation,including Inigation on-site,industrlallcommerclal reuse,or surface <br /> could Impact local surface and groundwaters water discharge were Implemented. <br /> and public health. Insufficient reclamation <br /> sites could result In Illegal and inappropriate <br /> discharge of treated wastewater. <br /> b)The permit application for the wastewater treatment plant shall Include a Review SJCDPW Dor treatment <br /> schedule for design,construction,and permitting for the plant to ensure that the Development plant <br /> wastewater treatment and reclamation facilities would be operational prior to the Permit application. <br /> approval of the first final subdivision map. <br /> c)Each Development Permit for the wastewater treatment plant shall describe the Review SJCDPW Dr treatment <br /> mechanism by which the construction of additional facilifies for incremental Development Plant <br /> expansion in treatment capacity shall be completed before the existing capacity Is Permit application. <br /> exceeded. <br /> PAGE 1 <br />