My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006060
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
0
>
2600 - Land Use Program
>
PA-0600146
>
SU0006060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 11:19:20 AM
Creation date
9/4/2019 6:10:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006060
PE
2611
FACILITY_NAME
PA-0600146
STREET_NUMBER
0
STREET_NAME
MOUNTAIN HOUSE
City
MOUNTAIN HOUSE
ENTERED_DATE
5/23/2006 12:00:00 AM
SITE_LOCATION
MOUNTAIN HOUSE
RECEIVED_DATE
5/23/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\E\ESTES\PA-0600146\SU0006060\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised Site Characterization Work Plan <br /> SMH Mountain House,LLC <br /> Page 5 <br /> 4.2.4 Liner Removal and Backfill <br /> The FML material and associated appurtenances (piping, sumps,pumps, wiring, etc.) will be removed for <br /> recycling or disposal at a sanitary landfill. The excavation will be filled and graded to the original <br /> topographic surface. <br /> 5.0 SCHEDULE AND REPORTING <br /> Once SMH receives approval from the Regional Board staff regarding this Site Characterization Work <br /> Plan and prior to any construction activity related to decommissioning, SMH will initiate the liner subsoil <br /> sampling activities and risk evaluation. An interim report of results will be prepared and submitted to the <br /> Regional Water Board for review and approval. If COPC are identified under the reservoirs as a result of <br /> the sub-liner soil sampling, the risks associated with any such COPC will be evaluated and discussed in <br /> the report; also, a supplemental Work Plan will be included proposing further action, if any, to address <br /> remediation or mitigation of risks to groundwater degradation. If no COPC are identified, there is no risk <br /> from the subsoil beneath the reservoirs and SMH will schedule decommissioning activities at a future <br /> time yet to be determined. The Regional Water Board staff will be notified 2 weeks prior to <br /> commencement of any decommissioning construction work. All construction work will be performed in <br /> accordance with construction stormwater regulations. Following completion of the regrading activities, a <br /> final closure report will be prepared for submittal to the Regional Water Board. This report will include <br /> details of residual solids disposal, backfill operations and will include photographs of the final site <br /> configuration. The report will include a request for written acknowledgment from the Regional Water <br /> Board that the wastewater discharge facilities were decommissioned according to guidance and with the <br /> concurrence of the Regional Water Board. <br /> 6.0 LIMITATIONS AND SIGNATURES <br /> Condor prepared this Work Plan under the direct supervision and responsible charge of a Professional <br /> Geologist in the State of California, who is familiar with the information presented in this Work Plan and <br /> all of its Attachments. Based on an inquiry of the individuals immediately responsible for obtaining the <br /> information, the undersigned Professional Geologist believes the information presented to be true, <br /> accurate, and complete. Condor is not responsible for the accuracy and completeness of information <br /> collected and developed by others. <br /> The Work Plan was prepared for SMH at the request of and for the sole use of SMH. If any changes made <br /> or errors found in the information used for this Work Plan, the interpretations and conclusions contained <br /> herein shall not be considered valid unless the changes or errors are reviewed by Condor and the Work <br /> Plan is either appropriately modified or re-approved in writing. The contents of this Work Plan may not <br /> be used or relied upon by any other person(s) without the express written consent and authorization of <br /> SMH and Condor. <br /> n <br /> i4) CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.