Laserfiche WebLink
Raymond Hoo -2- U <br /> COMMENTS ON DEVELOPMENTS <br /> PA-05-509 (SU) and PA-05-844 (ZR) <br /> Tile applicant s1rali con7picte tile follo ients b,,fbre flie Department of Public Works can support o <br /> REQUffiEMENH.S-,: <br /> 1. <br /> developer shall deposit ffinds with flie eutnity f6t ail costs, as estiniated by the Department of Pub i , <br /> Works Transportation Plarming Division,prior of Department of Public Works prepat ing or contr act* <br /> for the irequited study. 26my mitigation reqtfired by the traffic stud7 sirall be provided by the applicant, <br /> (Development Title Section 9-i 150.4) <br /> 2. 9Hie applicant shall stibmit a study to detarnine if the existing drainagc pond has adequate capacity to <br /> accept drainage from this de-mlopment. <br /> 3. Annexation of APN Of 9-i- <br /> for stozat dminage and street lighting shall be tequired. 26umexationof APN019-11EH2 into Eveimfoid <br /> emnintinity Service District shall be reqnired. <br /> 4. The applicant/develoncr shall be reattired to ae d dedicate or submit verification.of the abiiitr to <br /> . I and dedicate to the 6ottntv. the necessary rimm-of--Mmv to acco nodate a sixtv (66) foot coliectm <br /> roadwav alone south oroperty line to vide fbi connection of Sierra Drive and T 11Y RMCL. <br /> RECOMMENDATIONS: <br /> 1. All improvements shall be in conformance with the current Improvement Standards and Specifications of <br /> the County of San Joaquin. All improvement plans and specifications shall include grading plan for each <br /> individual lot, if applicable. These improvement plans and specifications are subject to plan check, field <br /> inspection fees and must be approved by the County of San Joaquin Department of Public Works prior to <br /> approval of the Final Map. <br /> (Development Title Section 9-240, Section 9-910, Section 9-1100 and R-92-814) <br /> 2. If improvements referred to herein are not completed prior to approval of the Final Map, the subdivider <br /> shall execute an agreement with the County of San Joaquin ensuring the completion of improvements <br /> within one (1)year after approval of the Final Map. (Development Title Section 9-1100.3U]) <br /> 3. A Preliminary Soils Report is required in accordance with the County Standards for the purpose of <br /> determining the R-Value for the design of the roads. (Development Title Section 9-910.2) <br /> 4. A grading plan shall be submitted as a part of the improvement plans and approved prior to approval of <br /> the Final Map. The grading plan shall contain the information listed in the California Building Code <br /> (CBC), Appendix, Chapter 33, Section 3309, complete drainage details and elevations of adjacent <br /> parcels. Retaining wall details shall be submitted where applicable. Grading in excess of 5,000 cubic <br /> yards shall comply with Sections 3309.3 and 3309.4 for"Engineered Grading Requirements." <br /> 5. Water meters shall be installed on all water services. (Board of Supervisors Order B-91-650) <br /> 6. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control Devices, <br /> CalTrans Traffic Manual and/or San Joaquin County Standards and shall be shown on the improvement <br /> plans. (Development Title Section 9-1150.2) <br />