Laserfiche WebLink
7 <br /> Specifically <br /> This permit application requests approval for the construction of one 140' 3 legged <br /> lattice tower with approximately an 18' base and the proper FAA clearance. (Please see <br /> attached photo of typical tower.) The tower will hold four (4) PCS wireless carriers <br /> panel antenna (9 panel antenna each). The typical size of panel antenna are 6' tall by S" <br /> wide. The towers will also hold one (1) paging company's antenna consisting of 3 whip <br /> antenna. Space will also be available for 8 microwave dishes. Each set of PCS and <br /> paging antenna must be spaced approximately 10' apart for clearance. CSD is leasing <br /> approximately 5200 square feet of property from the earlier mentioned property owner <br /> for the location of this tower as well as any/all accompanying radio cabinets/huts that <br /> these future carriers will require space for. This also includes space for vehicle <br /> maintenance access. The entire area will be secured by a 6' chain link fence topped with <br /> three strands of barb wire for the protection of the carriers equipment. A propane back- <br /> up generator will be installed for emergency power on one of the existing equipment <br /> pads. <br /> The required utilities will be brought in from the nearest available source. Access and <br /> easement issues have been approved by the property owner. As part of this application <br /> we would like to request ingress and egress from State Route 88. No public utilities <br /> such as water or sewer are necessary for the operation of this site. This site will be an <br /> unmanned service facility and will be serviced approximately once a month by <br /> maintenance technicians (1-2 hours). Construction of the lattice tower will take <br /> approximately b weeks and each carrier's installation of antenna will take 3-5 days. <br /> CSD will be responsible for managing the site, ensuring that all of the safety 4 <br /> requirements are met. CSD will comply with all of the local, state and federal safety <br /> requirements imposed on new tower facilities. The towers will be purchased from a <br /> local California Company and will be installed by a local construction firm. <br /> Benefits of a CSD Communications Tower Site: <br /> • Local jurisdiction will process fewer requests for towers. <br /> • As a third party, CSD will be able to facilitate the co-location of many <br /> wireless communications carriers onto one site rather than several sites. <br /> (Colocation is often offered to the planning departments but is seldom seen due to the <br /> competitive nature of the industry, the expense of retrofitting an existing pole, lack of <br /> Ieased ground space, etc..) <br /> • Carriers will benefit by gaining time and saving money, and therefore will <br /> be able to provide service to the local customers sooner. <br /> • The site will potentially provide enhanced emergency response for police, fire <br /> and paramedic services in the area. <br /> • Local, State and Federal emergency services will be encouraged to locate on the <br /> towers. <br />