Laserfiche WebLink
California Regional Water Quality Control Board <br /> Central Valley ReRro�1;hA! l4- RE h� � <br /> s, L I <br /> Robert Schneider,Chair f <br /> Arnold Schwarzenegger <br /> 'ferry Tamminen � <br /> Secretary for Sacramento Main O e p Governor <br /> Environmental Protection Internet Address: http://www.swrcbaI�f ¢el PM 2' 54 <br /> 11020 Sun Center Drive,#200,Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 -.FAX(916)464-4780 <br /> i <br /> � b <br /> 22 April 2004 <br /> Jermifer Jolley Cosentino Signature Enterprises, Ltd. LLC y <br /> San Joaquin County Community Develop. Depart. 7415 St. Helena Highway <br /> 1810 E. Hazelton Avenue Yountville, CA 94599 <br /> _—Stockton, CA_95205 <br /> PA-0400180 (UP), COSENTINO SIGNATURE ENTERPRISES, LTD. LLC, LOCKEFORD, SAN <br /> JOAQUIN COUNTY <br /> Staff has reviewed the application referral for expansion of an existing small winery into a medium <br /> winery. The document package was distributed by the San Joaquin County Community Development <br /> Department and is identified by number PA-0400180 (UP). Cosentino Signature Enterprises currently <br /> disposes its wastewater under Resolution No. R5-2003-0106,A Waiver of Waste Discharge <br /> Requirements for Small Food Processors, Including Wineries Within the Central Valley Region:" The <br /> Discharger can continue coverage under the waiver, if applicable, or can apply for site specific Waste <br /> Discharge Requirements (WDRs). <br /> Waste Discharge Requirements <br /> If wastewater will be disposed on site, WDRs will be required. The project proponent shall submit a <br /> Report of Waste Discharge (RWD) at least 150 days prior to discharging wastewater at the site. <br /> California Water Code Section 13260 requires submittal of the RWD. <br /> Construction Stormwater Permit <br /> rAn NPDES General Permit for.Storm Water.Discharges Associated with Construction Activities, Order <br /> No. 99-28-DWQ is required when a project involves clearing, grading, disturbances to the ground, such <br /> as stockpiling, or excavation. Currently, construction activity that involves soil disturbances on <br /> construction sites five acres or greater or which are part of a larger common plan of development or sale <br /> require a construction storm water permit. <br /> If construction associated with the project may disturb more than five acres,the property owner may <br /> need to obtain permit coverage under the NPDES General Permit No. CAS000002 for Discharges of <br /> Storm Water Associated With Construction Activity. <br /> Before construction begins, the proponent must submit a Notice of Intent to comply with-the permit to <br /> the State Water Resources Control Board and.a Storm Water Pollution Prevention Program (SWPPP) <br /> must be prepared. h <br /> California Environmental Protection Agency <br /> �a Recycled Paper <br />