My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004617
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18327
>
2600 - Land Use Program
>
PA-0300569
>
SU0004617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:10 AM
Creation date
9/4/2019 6:18:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004617
PE
2611
FACILITY_NAME
PA-0300569
STREET_NUMBER
18327
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
APN
01922026
ENTERED_DATE
8/24/2004 12:00:00 AM
SITE_LOCATION
18327 E HWY 88
RECEIVED_DATE
2/10/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\HWY 88\18327\PA-0300569\SU0004617\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�- <br /> SAN JOAOUIN �'-LEY UNIFIED AIR POLLUTION` `NTROL DISTRICT <br /> Comp lance Assistance Bulletin- Decem , 1994 <br /> Asbestos Synopsis <br /> s t ,emollit <br /> �Bnio'�-S airy- <br /> Prior to any renovation or demolition of a facility <br /> Inspec3:Conduct an asbestos Inspection of the site before: <br /> -Any renovation which 160 sq.ft.of building materials,or 260 linear feet of pipe insulation will be disturbed,or <br /> -Any demolition of a facility with or without asbestos-containing materials <br /> Notify:Submit an asbestos notification form for any regulated renovation or demolition, 10 working days before the activity. <br /> Fees: Fees must be paid to the District with the notification for all regulated renovations and demolitions. <br /> Qgmolition Release Form:Prior to any demolition,you must have completed a demolition release form.Upon its approval by the <br /> District this signed form may be used as proof(needed by the building official)of compliance with,or exemption from,the <br /> NESHAP notification requirements. <br /> Submit this form to the building department with your application for a demolition permit. <br /> Applicability <br /> Facilities subject to the NESHAP(regulated facilities)include all commercial buildings,apartments with more than 4 units,other <br /> structures and non-portable equipment.Single family dwellings may be exempt,but only on a case by case basis.. <br /> Demolitions subject to the NESHAP(regulated demolitions)are demolitions of facilities described above,whether or not asbestos <br /> is present. <br /> Reauiated renovation applies to any activity in which 160 sq.ft.of regulated asbestos-containing building materials or 260 linear <br /> feet of asbestos-containing pipe insulation is disturbed at a regulated facility. <br /> �estos?Notficatlon.ana.inspectiontRequirements f <br /> Hwy.t�l�'A.Y,•,.. .,Yl.•`.r'ikw.iLS�, ?N::I�.J/'NAa•S:S•. {S�,'k`la*' }R+uIj{w•-i��w'? xni�KliN a Slh.r?H• ,Mie 'w, <br /> Definitions <br /> Facilities. Facilities subject to the rule include "all structures, installations, buildings and <br /> equipment, except for single family dwellings and apartments with four or fewer dwelling <br /> units." Single family dwellings and apartments are also subject to the regulation if., <br /> -There is more than one building at a site being renovated or demolished,or <br /> -The building had been used for,or is being removed for a commercial or public use,or <br /> is to be used as a training bum exercise. <br /> Demolition: In addition to the total destruction of a structure,demolitions include"the removal of any <br /> structural load-bearing member from a 'facility together with any related handling <br /> operations or the intentional burning of a building: (training bums conducted by a fire <br /> fighting agency). Also, the separation of a structure from its foundation prior to <br /> relocation is a demolition, <br /> Renovation: Altering a facility or one or more facility components in any way, including the stripping or <br /> removal of regulated asbestos-containing material (RACM) from a facility component. <br /> Renovations include all activities in which asbestos could be disturbed at a regulated <br /> facility,including the clean up and removal of debris from buildings which have burned. <br />
The URL can be used to link to this page
Your browser does not support the video tag.